Advertisement

Quick Links

User Manual
Ionizer
KERN ALJ-A03
Version 1.0
2018-08
GB
KERN & Sohn GmbH
Ziegelei 1
D-72336 Balingen
E-mail: info@kern-sohn.com
Phone: +49-[0]7433-9933-0
Fax: +49-[0]7433-9933-149
www: www.kern-sohn.com
ALJ-A03-BA-e-1810

Advertisement

Table of Contents
loading

Summary of Contents for KERN ALJ-A03

  • Page 1 KERN & Sohn GmbH Ziegelei 1 Phone: +49-[0]7433-9933-0 D-72336 Balingen Fax: +49-[0]7433-9933-149 E-mail: info@kern-sohn.com www: www.kern-sohn.com User Manual Ionizer KERN ALJ-A03 Version 1.0 2018-08 ALJ-A03-BA-e-1810...
  • Page 2: Table Of Contents

    KERN ALJ-A03 Version 1.0 2018-08 User Manual Ionizer Contents Table of contents GENERAL INFORMATION ................3 BASIC SAFETY GUIDELINES ................. 3 TECHNICAL SPECIFICATION ................ 5 DEVICE OVERVIEW ..................6 UNPACKING, PLACEMENT AND START-UP ..........7 Unpacking .............................. 7 Scope of delivery ........................... 7 Installation ..............................
  • Page 3: General Information

    Because a high-voltage technology is used, handle the ion source and outputs with care. Do not dismantle and do not modify the ionizer. Prevent any damage caused by falls, vibrations or im- pact, see the label to the left. ALJ-A03-BA-e-1810...
  • Page 4 (mistaken weighing results). Discharge the sample at the appropriate distance from the balance. The ionizer may heat slightly during the operation. For improved ionization results, switch the blower on. This will make the sample discharge time shorter. ALJ-A03-BA-e-1810...
  • Page 5: Technical Specification

    0–50°C, air humidity 20–80% (non-condensing) Power adapter 100–240 VAC, 50/60 Hz Input voltage Ionizer 12 VDC, 500 mA input voltage Pollution degree Overvoltage category Category II Height above see level up to 2000 m for the installation Installation site Only indoors ALJ-A03-BA-e-1810...
  • Page 6: Device Overview

    (automatic switch-off in 8 h) (t2-minute work mode) To switch between the two work modes, press one of the two buttons. Indication overview Green LED Ionizer operating Ionizer on Red LED Ionizer operating Continuous Mode Red LED flashes Ionizer operating Time Mode ALJ-A03-BA-e-1810...
  • Page 7: Unpacking, Placement And Start-Up

    Unpacking, placement and start-up Unpacking Remove the device carefully from its packaging, remove the plastic bag and place the device in the working loca- tion. Scope of delivery 1. Ionizer 2. Power adapter EURO/UK/US/AUS 3. User Manual Installation ALJ-A03-BA-e-1810...
  • Page 8: Power

    The printed voltage value must comply with the local volt- age. Always use the original power adapters by KERN. To use any other products, you need the consent of KERN. Always connect the ionizer to the power adapter when the device is off.
  • Page 9: Applications

    Place the ionizer near the balance.  Discharging beakers etc. When you shake the beaker with the powder sample, the powder will deposit on the inner beaker wall. This will be prevented by discharging the beaker. ALJ-A03-BA-e-1810...
  • Page 10: Maintenance, Service, Disposal

    Keep the ion sources clean. Maintenance, service The device can be operated and maintained solely by ser- vice technicians trained and authorised by KERN. Disconnect the device from the power supply before you open it. Disposal...

Table of Contents