IMPORTANT SAFETY AND INSTALLATION INSTRUCTIONS
WARNING: Risk of fire and electrical
shock. This product is to be installed by
a qualified electrician only.
CAUTION: When using electrical
equipment, basic safety precautions
should always be followed including the
following: Read all instructions carefully
before installation and save
NOVATO 2 x 2 FRAME - BCE
INSTALLATION:
1. LOCATE MOUNTING LOCATIONS USING ACTUAL FIXTURE IN
DESIRED LOCATION.
2. DRILL 11/16" HOLES THROUGH NON-CONDUCTIVE CEILING PLANE.
3. MOUNT BUTTON CANOPY THROUGH EACH HOLE AND ASSEMBLE
COMPONENTS AS SHOWN IN FIGURE A.
4. SECURE HANGER BRACKETS TO STRUCTURE.
5. INSERT AIRCRAFT CABLE INTO CABLE GRIPPERS AND ADJUST TO
DESIRED FIXTURE SUSPENSION HEIGHT. LEVEL FIXTURE.
(CONTINUED ON PAGE 2)
AIRCRAFT CABLE
SPI LIGHTING
for future use. Make sure installation and
all connections are in accordance with
National Electrical Code and any local
regulations. To avoid possible electrical
shock, be sure that power supply is turned
off before installing or servicing this fixture.
Servicing should be performed by qualified
service personnel.
TM
(4.59)
FIGURE A
Tel ( 262)-242-1420 FAX: (262)-242- 6414
These instructions do not claim to cover
all details or variations. When additional
information is desired, please contact
your SPI representative.
HANGER BRACKET
(SIDE COVER REMOVED
FOR CLARITY)
3/8 NPS LOCK NUT
5/8" WASHER
CEILING
(NON-CONDUCTIVE)
BUTTON
CANOPY
CABLE GRIPPER
contact@spilighting.com
05/02/19
IS103451X
Need help?
Do you have a question about the NOVATO 2 x 2 FRAME BCE and is the answer not in the manual?
Questions and answers