Advices for mounting

Advertisement

Quick Links

Example of LOAD MODULE orientation
To achieve good weighing results, always use flexible connections
to the vessel and check that no ladders or other arrangements
connect the weighed vessel to surrounding foundation, walls or roof.
www.blhnobel.com
Document no. 35126
Publication 850 205 R4
© Vishay Nobel AB, 2010-07-28
Subject to changes without notice.
Advices for mounting
KIMD-1 and KOM-1

Advertisement

loading
Need help?

Need help?

Do you have a question about the BLH Nobel KIMD-1 and is the answer not in the manual?

Questions and answers

Summary of Contents for VPG BLH Nobel KIMD-1

  • Page 1 Advices for mounting Example of LOAD MODULE orientation KIMD-1 and KOM-1 To achieve good weighing results, always use flexible connections to the vessel and check that no ladders or other arrangements connect the weighed vessel to surrounding foundation, walls or roof. Document no.
  • Page 2 Check that there is LOCKING Standard LOAD MODULE a lateral play between PLATE YOKE and LOAD CELL by YOKE making sure that it is aligned with the LOAD CELL. LOAD CELL BRACKET TILT GUARD Assemble LOAD CELL, BRACKET, and YOKE to one LOAD MODULE. Attach YOKES under the vessel supports and position the vessel on the LOAD MODULES.

This manual is also suitable for:

Blh nobel kom-1