Advices for mounting Example of LOAD MODULE orientation KIMD-1 and KOM-1 To achieve good weighing results, always use flexible connections to the vessel and check that no ladders or other arrangements connect the weighed vessel to surrounding foundation, walls or roof. Document no.
Page 2
Check that there is LOCKING Standard LOAD MODULE a lateral play between PLATE YOKE and LOAD CELL by YOKE making sure that it is aligned with the LOAD CELL. LOAD CELL BRACKET TILT GUARD Assemble LOAD CELL, BRACKET, and YOKE to one LOAD MODULE. Attach YOKES under the vessel supports and position the vessel on the LOAD MODULES.