O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 2 Contents eneral 1. Introduction Page 4 2. Intended use Page 4 2.1 LIABILITY PAGE 5 2.2 WARRANTY 3.
Page 3
13.1 EXPERT MENU OVERVIEW 13.2 SETTINGS 14. Technical data Page 25 15. Layout sketch Page 26 15.1 LAYOUT SKETCH LBE 250 (WALL-MOUNTED) 15.2 LAYOUT SKETCH LBE 500 (WALL-MOUNTED) 16. Mounting Page 28 17. Connections/installation Page 29 17.1 ROUTING OF AIR LINES 17.2 WASTE WATER CONNECTION...
• 2.2 WARRANTY The warranty begins with initial startup, dification unit LBE 250/500 must not be at the latest, however, one month after dismantled without the previous written delivery has taken place. The warranty authorization of the manufacturer. The...
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 6 3. Safety Instructions General information After commissioning, the current supply may not be The following safety symbols indicate text passages that warn against risks interrupted for longer than one and sources of danger.
Page 7
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 7 Device setup/installation Water connections The device may be installed only in The water, heating, and waste water frost-free, dry rooms.
Women 15 – 18 years 19 – 45 years Over 45 years 4.1 DIMENSIONS AND WEIGHT LBE 250 LBE 500 800 x 460 x 420 870 x 600 x 600 Dimensions of the packing unit (B x H x T)
5. Structure 1 Water tank 7 Reverse osmosis membrane 2 Motor (LBE 250, 1 pc / LBE 500, 2 pcs) 3 UVC pipe for disinfection 8 Outlet pump 4 Sensor plate with a temperature and 9 Electronic operation system...
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 1 1 7.2 HUMIDITY CONTROL The air humidity is controlled using the The passing air flow absorbs moisture water moistened surface of the bladed from the wet blades, in accordance with rotor and the water level in the tank.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 1 2 7.3 TEMPERATURE CONTROL The air outlet temperature of the hu- TemperatureE21°C < midification unit is controlled either by the sensor built into the device or by an external sensor, where one has been attached.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 1 3 8. Control system The device is provided in a preprogram- med manner and can be commissioned immediately after all connections (air, water, and electrical) have been estab- lished.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 1 4 8.3 SETTINGS • With the Temperature parameter, the air temperature at Temperature 21°C < the outlet of the air humidification unit is set between 15 °C and 25 °C in one degree intervals.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 1 5 9.2 AUTOMATIC ACTIVATION/DEACTIVATION (AUTO STANDBY) • If the On/Off button is pressed, the following appears on a uto S TANDBY the display: auto STANDBY.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 1 7 12. Commissioning • After all complete connections have been established (ventilation, water, and electrical), the air humidification unit Trans.lock rem? can be commissioned.
Circ. Pump On< Open Mixer On< O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 1 8 Close Mixer On< 12.1 POSSIBLE FAULT MESSAGE •...
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 1 9 13. Expert menu 13.1 EXPERT MENU OVERVIEW Int. Sensor Floating switch Floating switch Expert TempControl Ext.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 2 0 13.2 SETTINGS • This shows whether the air temperature is controlled via Int. Sensor <...
Page 21
Time Valve Wat.Repl. < 260s Setting range: 20 – 600 seconds Factory setting: 260 seconds LBE 250 180 seconds LBE 500 • This parameter is used to set the refill time of the water during humidity control. The air humidity is determined Time Valve Ctrl.
Page 22
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 2 2 • Deletes the operating hours meter of the UVC pipe. Can Reset UVC be performed after every UVC pipe change.
Page 23
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 2 3 • The Elect. Heating parameter is used to set whether the device is equipped with an electricheater battery (Elect. Heating Act.) or a water heater battery (Elect.
Page 24
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 2 4 • In the menu Status memory the last 9 actions of the Status memory control unit can be retrieved with the time stored.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 2 5 14. Technical data Version LBE 250 LBE 500 Air volume flow [m³/h] max. 250 max.
Air volume flow [m³/h] 1 LBE 250 with water heater battery 2 LBE 250 with PTC electric heater battery 3 LBE 250 with water heater battery and low temperature auxiliary heating unit with integra- ted water batter 4 LBE 500 with water heater battery 15.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 2 7 Air humidification unit LBE with PTC electric heater battery Type 08LBE250RE / 08LBE250LE (Dimensions: W x H x D = 510 x 385 x 360 mm) 15.2 LAYOUT SKETCH LBE 500 (WALL-MOUNTED) Air humidification unit LBE with warm water heater battery Type 08LBE500RW / 08LBE500LW (Dimensions: W x H x D = 610 x 560 x 510 mm)
The device may be installed only in must be maintained above the compliance with the national installation air humidifier. A minimum spacing of 25 cm (LBE 250 / LBE 500) must be main- regulations. tained below the air humidifier. The device may be installed only in frost-free, dry rooms.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 3 0 17.3 MAINS WATER CONNECTION Only mains water that corresponds with Water connection set (accessory), con- the local mains water ordinance may sisting of: be used for the water supply.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 3 1 17.5 HYDRAULIC CONNECTION DIAGRAM Feed line/return line 55/45 °C Heating system Air inlet Return line Feed line 17.6 LOW TEMPERATURE HEATING...
Page 32
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 3 2 Connection diagram parallel circuit highest possible evaporation line is with thermostatic valve: With this obtained in connection with the available connection variant the system can be flow temperature.
Page 33
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 3 3 An „external temperature“ sensor has LBE-250 can also be integrated directly to be installed in the air supply duct (without mixer and external sensors) approx.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 3 4 18. Wiring diagram Control board LBE 250/ LBE 500 Connecting terminals 1 through 24 are With Ventilation Device Switch Input, the labelled on the motherboard and desi-...
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 3 5 19. Error messages (expert) In the case of error messages, an alarm pressed for 3 seconds or in the Service sounds which can be deactivated by menu under the Delete Fault Yes<...
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 3 6 19.5 HUMIDITY TOO LOW! (EXPERT) • If the relative humidity undershoots the reference value Humidity too low! by 20 % for a period of 25 hours, the water is drained and the unit switches off.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 3 7 20. Maintenance (expert) 20.1 UVC TUBE REPLACEMENT Maintenance may be performed only by expert personnel. After the Service display message appears, the following tasks should be performed: 1.
Page 38
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 3 8 5. Fold down the front panel of the housing and lift the innercover. Grab the rotor only when wearing gloves since the blades have sharp edges (danger of injury).
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 3 9 20.2 OSMOSIS MEMBRANE REPLACEMENT Maintenance may be performed only by expert personnel. After the Service display message appears, the following tasks should be performed: 1.
Page 40
To disconnect the inlet hose from the hose connec- tor,, push the click system backwards. Then the hose can be removed (LBE 250 1 x / LBE 500 2 x). b.) Then remove the cover, pull out the reverse osmo- sis housing and the osmosis membrane(s) from the housing.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 4 1 20.3 CLEANING Maintenance may be performed only by expert personnel. After the Service display message appears, the following tasks should be performed: 1.
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 4 2 5. Clean the water tank and UVC pipe. In case of scale- deposits, clean with descaling agent and then rinse thoroughlywith water.
Page 43
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 4 3 1. Switch off the ventilation unit to prevent the gases of the cleaning agent from entering the ventilated rooms. 2.
Page 44
01: No Fault Error Messages Rec. Fact.Setting Fact.Setting load? O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 4 4 Hi:680 Lo:260 Air Curr.Setup Dta:080 7.
Dependable operation is ensured only if genuine spare parts are used! Designation Item number Water filter 40E0003A UVC pipe 40I0023A Osmosis membrane (LBE 250) 40C0029A Osmosis membrane (LBE 500) 2 pcs required 40C0029A Cable temperature sensor, length 2 m 40I0020A...
Bezeichnung/Product description: LBE 250 / LBE 500 Ausführungen/Type: LBE 250 RE / LE / RW / LW LBE 500 RW / LW Die bezeichneten Produkte stimmen in der von uns in Verkehr gebrachten Ausführung mit den Vorschriften folgender europäischen Richtlinien überein:...
O PERATI NG A N D I NSTALL ATION I NSTRU CTI ON S L BE 2 50 / L BE 5 00 PAG E 4 7 23. Subject to change without notice We are constantly performing technical improvements and optimisations on your products and reserves the right to mo- dify the devices or technical data without prior notice.
Page 48
Responsible for the content: J. Pichler Gesellschaft m.b.H. PASSIVHAUS Photos: Archiv J. Pichler Gesellschaft m.b.H. | Text: J. Pichler Gesellschaft m.b.H. TIROL All rights reserved | All photos are symbolic photos | Subject to change without notice Version: 01/2020 DB/KP Netzwerk für Information,...
Need help?
Do you have a question about the LBE 250 and is the answer not in the manual?
Questions and answers