KOTRBATY KM-U Series Assembly Manual

Technical conditions, tube gas fired infrared radiant heater, attachment b1, 3 to 6 meter long

Advertisement

Technical conditions
Tube gas fired infrared radiant heater
KM 10-U; KM 15-U; KM 22,5-U; KM 30-U; KM 36-U; KM 45-U
Attachment B1
Assembly guide for tube
3 to 6 meter long
KOTRBATÝ V.M.Z., spol. s r.o., Sdružená 1788, 393 01 Pelhřimov, Česká Republika
http://www.kotrbaty.cz
radiant heaters
KM-U
v.1/2019

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the KM-U Series and is the answer not in the manual?

Questions and answers

Summary of Contents for KOTRBATY KM-U Series

  • Page 1 KM 10-U; KM 15-U; KM 22,5-U; KM 30-U; KM 36-U; KM 45-U Attachment B1 Assembly guide for tube radiant heaters KM-U 3 to 6 meter long KOTRBATÝ V.M.Z., spol. s r.o., Sdružená 1788, 393 01 Pelhřimov, Česká Republika http://www.kotrbaty.cz v.1/2019...
  • Page 2 Work actions performed at height above 1.5 m are classified as work at heights with all the mandatory consequences! KOTRBATÝ V.M.Z., spol. s r.o., Sdružená 1788, 393 01 Pelhřimov, Česká Republika http://www.kotrbaty.cz v.1/2019...
  • Page 3 6.1 Stainless-steel reflector front 6.2 Stainless-steel reflector end 6.3 Stainless-steel reflector middle 7. Fan box (KM-1 and KM45-U only) 8. Insulation clip (version with insulation only) KOTRBATÝ V.M.Z., spol. s r.o., Sdružená 1788, 393 01 Pelhřimov, Česká Republika http://www.kotrbaty.cz v.1/2019...
  • Page 4 It is necessary to perform the lifting uniformly and protect the heating surface from falling down KOTRBATÝ V.M.Z., spol. s r.o., Sdružená 1788, 393 01 Pelhřimov, Česká Republika http://www.kotrbaty.cz v.1/2019...
  • Page 5 Connect one end of the hose to the cock valve on the gas piping. Seal the connection c) The end of the hose with union nut is to be connected to the threaded end on the burner box (1) KOTRBATÝ V.M.Z., spol. s r.o., Sdružená 1788, 393 01 Pelhřimov, Česká Republika http://www.kotrbaty.cz v.1/2019...
  • Page 6 13) The installation of the flue gas tube is done next and eventually combustion air inlet as well according to the project documentation. KOTRBATÝ V.M.Z., spol. s r.o., Sdružená 1788, 393 01 Pelhřimov, Česká Republika http://www.kotrbaty.cz v.1/2019...