Page 2
Pag 2 TABLE OF CONTENTS 1. “SUENO” Mantel Pag. 3 Warranty 2. Installing the “SUENO” mantel base unit Pag. 3 Preparations 3. Installing the “SUENO” mantel base unit with plinth Pag. 3 Preparations Gas supply pipe modification Installing the plinth and mantel 4.
Page 3
Pag 3 1. “SUENO” mantel The mantel has a design that can be applied to many interiors because of its many possibilities. The mantel can be assembled based on your requirements because it is supplied in various subdeliveries. All subdeliv- eries have been packaged in a separate box.
Pag 4 The HI-FIRE base unit has a rear connection as standard but if the plinth is used, access will be blocked. The connec- tion must, therefore, be moved to the side. (Refer to page 8.) Position the unit carefully on its back and take the 3/8” sealing cap and turn it around the end of the 3/8”...
Page 5
Pag 5 Sueno mantel Top exhaust closing plate Closing plate check nuts (3x) Mantel safety plate Mantel valve Hi-Fire base unit 45° concentric bend M10 x 20 set bolts (2x) M10 x 30 fastening bolts (2x) M8 cotter bolts (4x) Cotter bolt washers Cotter bolt nuts Wall bracket...