Advertisement

Quick Links

user's instructions
MH 5
heater to move®
MH 10
innovative heat systems

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the heater to move and is the answer not in the manual?

Questions and answers

Summary of Contents for Scheer heater to move

  • Page 1 MH 5 heater to move® MH 10 innovative heat systems...
  • Page 2: Introduction

    With your purchase of the heater to move®� you ensured for yourself� to have a heating system with cur- heater to move®� you ensured for yourself� to have a heating system with cur- �...
  • Page 3: Table Of Contents

    (definition) warning and safety signs general operating instructions transport, storage and assembly commissioning filling and venting boiler setting...
  • Page 4: Technical Data Burner

    BlauthermDUO BE The BlauthermDUO BE is an oil blower burner. It has automatic altitude control up to 2000m above sea level and is equipped with SCHEER (precision-) spring technology in the nozzle block. Blautherm DUO BE burner type...
  • Page 5: Technical Data Boiler

    BE / SBN - 45 - MHF type t ype of fireplace low-temperature boiler fuel fuel oil according to DIN 51603 nominal heat output CE-label CE-0045CMKD 2340 (according to oil equipment directive) Permissible flow temperature °C...
  • Page 6: Boiler Dimensions

    Tankeinfüllstutzen Handlauf Tankanzeige Elektronische Regelung Rahmenkonstruktion aus 30x30 Vierkantrohr Kesselunit Tank 40L Ausdehnungsgefäß Handlauf Vollgummiräder Ø260 Vorlaufrollen mit Bremse Leergewicht gesamt 110 Kg Abdeckklappe Vorlauf-/ Regelung Rücklaufanschluss Verbrennungsschutz Abgasrohr Befüll- und Ablasshahn www.scheer-heizsysteme.de...
  • Page 7: Warning And Safety Signs (Definition)

    Improper installation or improper repair can cause a fire or the leakage of deadly carbon monoxide leading to serious injury or death. • The person to install and repair the heating system must have completed a SCHEER training course. • Always follow all installation and repair instruction.
  • Page 8: Warning And Safety Signs

    In risk of frost� drain the fresh water out of a heat system with plate heat exchanger. Note: SCHEER cannot be held liable for: • Defects and damage� which are due to installation or repair by unauthorized and untrained persons.
  • Page 9: General Operating Instructions

    The MH-heating systems are approved for the use of „diesel“ and „heating oil“. Any other type of fuel for operating have to be in advance approved by the manufacturer SCHEER. The heaters are designed for 230 Volts. The connection in the vehicle has to be fed from the battery of the vehicle via an inverter approved in road traf- fic within the scope of the ECE Regulation.
  • Page 10: Commissioning

    • Connect the connecting pipes for return flow (blue) and flow (red) to the on-site heating system • Check whether the ball valves with a thermometer handle are closed • Close if necessary filling and venting •...
  • Page 11: Boiler Setting

    Diesel/ Hybrid arrow buttons switch display (temperature + -) P button FI-switch main fuse Circuit breaker (Program/Confirm) Heating rod automatic Switch the diesel or hybrid selector switch to the desired position • Set FI-switch and the switches main fuse automatic and Circuit breaker Heating rod to •...
  • Page 12: General Disturbance Table

    FI and automa- tic circuit breakers in the device and in the on-site distributor� check whether the system is switched at low pressure: top up with water system pressure too low or too high (pressure should be min.
  • Page 13: Burner Disturbance Table

    preheater...
  • Page 14: Disturbance Code Table Controller

    The lockout reset button is the key operating element for resetting� activating / deactivating� and diagnos- tics. The multi color signal lamp behind the clear cover of the lockout reset button is the key indicating compo- nent for visual diagnostics and interface diagnostics.
  • Page 15: Optional Equipment

    • The air heater is equipped with a thermostat • The connection between air heater and heater to move® is made with a flow/return flow hose of a certain length provided by the customer • Heat-resistant exhaust gas duct in a length determined by the customer...
  • Page 16 - heater to move - SCHEER Heizsysteme & Produktionstechnik GmbH Chausseestr. 16 D-25797 Wöhrden Tel.: + 49 (0) 4839 / 905-0 Fax.: +49 (0) 4839 / 453 info@scheer-heizsysteme.de www.scheer-heizsysteme.de best in convenience and comfort www.scheer-heizsysteme.de...

Table of Contents