Page 1
PolyDrain Pre-Engineered Surface Drainage PDX - Toggle Lock Installation Guide P.O. Box 837 - 259 Murdock Road - Troutman, NC 28166 Tel (704) 528-9806 - Fax (704) 528-5478 - www.abtdrains.com Toll free in the USA, Canada, and Mexico (800) 438-6057...
Page 2
Grate Retainer Nut - 5/16" Square Nut Some products sold by ABT contain chemicals known to the State of California to cause cancer, birth defects or other reproductive harm. Products sold by ABT may contain these chemicals in a smaller amount than Proposition 65's concern, or not at all, however, we have chosen to issue this warning on all of our products as an act of caution and because our customers have the right to know.
Page 3
Support Lumber Finished Grade Elevation 1/2" Min 2. LEG ATTACH 2" Min. Above Dirt 1. EXCAVATION Anchor Slab Above U-Leg T = per Structural Engineer Set Top of Rails to Finished Elevation Tie Wire End Rail Grade Stake Blank or Horiz. Outlet End Plate (as Specified) Caulk or Adhesive 3.
Page 4
Blank or Inlet End Plate (as Specified) Attach End Plate to Channel with Adhesive, Caulk or Duct Tape 8. PLACE ANCHOR SLAB See Step 1 for Dimensions 7. END PLATE Use Vibrator to Consolidate Verify Trench Alignment Concrete and Elevation Remove Suspension Lumber as Required Cut Excess Length...