Page 1
Sun Lounge Assembly Instructions Modular greenhouses, garden sheds, outdoor garden elements and accessories Designed and manufactured by Rion A Member of the Plasson Group Rion Ltd. Cabri 25120 Israel Tel: +972-4-995-2666, Fax: +972-4-995-2677 email: rion@rion.com homepage: http://www.rion.com...
Safety First • Please read these Assembly Instructions completely before assembly and keep them in your records so you can refer to them if you wish to add options or make repairs. • The instructions in this manual lead you through each step in the assembly process. It is important for you to follow them closely.
Page 4
Introduction Congratulations on purchasing an Sun Lounge. We are certain that it will give you many happy years of pleasure in your garden. Sun Lounge has been designed to be as easy to put together as it is beautiful to look at. Most of the work can be done by a single person.
Page 5
40 mm x 6 mm (1A” x B”) screw, screw/anchor set or expansion anchor Decide at this time the final orientation of your Rion Sun Lounge. We recommend that you place your Sun Lounge against a wall that receives direct sunlight and is protected from the wind as much as possible.
Page 6
Identify Sun Lounge Parts Because of the Sun Lounge modularity, you may purchase up to two LTMs to fit your needs. Take a minute to make sure you have everything you need. Note: Do not proceed with assembly if any parts are missing. The part code is stamped on each connector.
Page 7
Part Code LTF (Front) LTB+M (Back + Middle) LTM (Middle) Description T-Oval Connector Oval Junction Connector Corner Frame Connector Top Right Frame Connector Top Left Frame Connector Top Wall Connector Wall Connector Corner Oval Connector Base Profile (109 cm, 3’ 6G”)) Base Profile (50 cm, 1’...
Page 8
Part Code LTF (Front) LTB+M (Back + Middle) LTM (Middle) Description PN56 Upper Roof Panel (side) (150.8 x 60.5 cm, 4’ 11E” x 1’ 11F”) PN52R Pediment Panel (Right) PN52L Pediment Panel (Left) WIN41 Roof Vent WINH31 Roof Vent Handle Flexible Glazing Seal (m) Door Sealer (packages) Roof Glazing (129 cm, 4’...
Page 9
Lay Out The Sun Lounge Frame Place the parts of the frame on the prepared foundation. The door can be placed on the left or right face of your Sun Lounge. with Left Entrance Sun Lounge Slide the SR1 profile into the B2 frame profile that will be used for the doorway.
Page 10
Push the frame flush against the wall and check that it is perfectly rectilinear by measuring the diagonals and verifying that they are the same. Make sure that the frame is level by using a level. Note: The wall to which you are securing your Sun Lounge must...
Page 11
Assemble the Sun Lounge Pediments with Left Entrance Sun Lounge Put the connectors and profiles of the top triangular window of the doorway pediment together except for the 7A pediment connector. Remove the plastic film from the PN52R pediment panel and put it in place. Note: If your model includes polycarbonate panels with UV protection, there is a single plastic film indicating the outside.
Page 12
with Right Entrance Sun Lounge Put the connectors and profiles of the top triangular window of the doorway pediment together except for the 6A pediment connector. Remove the plastic film from the PN52L pediment panel and put it in place. Note: If your model includes polycarbonate panels with UV protection, there is a single plastic film indicating the outside.
Page 13
Assemble the Roof Framework Note: Assemble the roof in an area not too far away from the completed frame. Assemble one arch. Lock the parts in place using pins. Assemble the rest of the arches according to the number of LTMs you have purchased.
Page 14
Prepare the Roof for Panels Note: The illustration is of a Sun Lounge with the entrance in the left pediment. The assembly steps are identical. Attach RB8 and RB7 glazing elements where shown. Place one end in the top channel and push them down along the length of the profile.
Page 15
Raise the Sun Lounge Roof Put the R1 round profiles in place. Add the E1 oval profiles. Put the B1 profiles on the frame Place a 15 base connector and a B12 frame profile on the doorway side to complete the framework. ...
Page 16
Remove the plastic film from a PN1 panel. Note: If your model includes polycarbonate panels with UV protection, there is a single plastic film indicating the outside. Acrylic panels are protected by plastic film on both sides. Remove the plastic before installation.
Page 17
Secure Sun Lounge to the Wall Place a BC1 frame clamp on the inside of the frame profile and mark the concrete with a pencil. Drill a hole with a masonry bit suitable for your 6 mm (B”) x 40 mm (1A”) screw/ concrete anchor set or ...
Page 18
Cover the Roof Moisten the RD2 elements with soapy water. Remove the plastic film from the PN57 panel and slide the panel between the RD glazing elements. Note: If your model includes polycarbonate panels with UV protection, there is a single plastic film ...
Page 19
Moisten the RD2 elements with soapy water. Remove the plastic film from the PN57 panel. Make sure that the proper side faces out. Slide the panel between the RD glazing elements. Note: If your model includes polycarbonate panels with UV ...
Page 20
Moisten the RD elements with soapy water. Remove the plastic film from the PN55 panel. Make sure that the proper side faces out. Slide the panel between the RD1 glazing elements. Note: If your model includes polycarbonate panels with UV protection, there is a single plastic film indicating the outside.
Page 21
Seal Panels Take the roll of GF sealer and pull out enough for one side of a PN1 panel. Cut it to length. Align it with the channel of the column profile. Push it in to seal the PN1 panel. Use the GT1 pin & glazing tool if needed. ...
Page 22
Assemble the Door (Left Entrance Option) Assemble the lower portion of the door. Attach the Door12 Slider to complete the door. Lock the connectors in place with pins. Lock the parts of the door in place with pins. ...
Page 23
Attach the Door (Left Entrance Option) Remove the pins from the side of the doorway where shown. Cut a piece of DSN Door Sealer and place in the channel. Remove the inner sleeve (the part that will face the inside) from ...
Page 24
Assemble the Door (Right Entrance Option) Assemble the lower portion of the door. Attach the Door12 Slider to complete the door. Lock the connectors in place with pins. Lock the parts of the door in place with pins. ...
Page 25
Attach the Door (Right Entrance Option) Remove the pins from the side of the doorway where shown. Cut a piece of DSN Door Sealer and place in the channel. Remove the inner sleeve (the part that will face the ...
Final Touches Go inside your new Sun Lounge and seal any gaps between the PN2 and PN2A panels and the profiles using SF soft foam insulation. Cut pieces of SF soft foam insulation 2.5 cm (1”) long, remove the adhesive backing, and place where shown, making sure that the area is clean and dry.
Need help?
Do you have a question about the Rion Sun Lounge and is the answer not in the manual?
Questions and answers