Product Description - AEG PROSOURCE Installation And User Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

2.11 Procedure in the event
of breaks in operation
• After a break in operation exceeding
two days (weekend, holiday, etc.),
the appliance must be flushed with 4
or 8 litres of water before being

3. PRODUCT DESCRIPTION

3.1 Main components appliance (see image 1)
Part
A
B
C
D
E
3.2 Main components boiler (see image 2)
Part
1
2
3
4
5
Description
Boiler
Tap
Pressure safety valve with t-piece, hose, bracket, 4 screws and tie wrap
Mixing valve with extension hose (for combi situation only)
Filter with hose (optional)
Description
Cold water inlet (blue label)
Boiling water outlet (red label)
Plug
LED indicator
ON/OFF button
reused, depending on the capacity
of your boiler.
• After a shutdown of 4 weeks or
more, the filter cartridge must be
replaced by a new one. Refer to the
manual of the filter for more
information.
ENGLISH
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents