Download Print this page
Fleet Complete AT1000 Self-Installation Manual

Fleet Complete AT1000 Self-Installation Manual

Asset tracker

Advertisement

Quick Links

v. Feb 2014
ASSET TRACKER
AT1000
Self-Installation Guide
AT1000 KIT
INCLUDES
AT1000 Device
Pigtail (60 cm harness)
Cradle
4 Zipties
Watch the 2 minute installation video here >

Advertisement

loading
Need help?

Need help?

Do you have a question about the AT1000 and is the answer not in the manual?

Questions and answers

Summary of Contents for Fleet Complete AT1000

  • Page 1 Feb 2014 ASSET TRACKER AT1000 Self-Installation Guide AT1000 KIT INCLUDES AT1000 Device Pigtail (60 cm harness) Cradle 4 Zipties Watch the 2 minute installation video here >...
  • Page 2 Self-installation Guide: AT1000 OVERVIEW OF THE AT1000 LEDS The AT1000 LED indicator lights have been designed to provide a simple visual reference regarding the device’s current status. The table describes each status and the respective LED indications. Network/Cell Emergency Device Status...
  • Page 3 4. Use nylon cable ties to secure the unit. 5. The AT1000 has four cables in the pigtail cable harness: a) Power (Red Wire) b) Ground (Black Wire) c) Input #1 (Orange) d) Input #2 (Brown) NOTE: If input wires are not used, wrap or tape the wires separately to avoid short circuiting and battery drainage.
  • Page 4 How long does it take for the AT1000 de- gency button on the front. The power LED should light, and glow for ~3 seconds. After...