Page 1
If there is a shortage or wrong material, Follow all safety practices while assembling call Dealer Service immediately. and installing this product. Dura-Bilt Products, Inc. P.O. Box 188 Wellsburg, N.Y. 14894 Dealer Service 570-596-2000 E-Mail info@durabilt.com DURA-BILT RESERVES THE RIGHT TO CHANGE DESIGN AND/OR SPECIFICATIONS WITHOUT NOTICE.
Page 2
Fasteners Description #12 x 1-1/2” Screw #10 x 1” Hex Heads Screw Magni 599 Coated #8 x 1/2” Self-Drilling Screw 1/4”-20 x 3” Carriage Bolt Wing Nut Note: The #10 x 1” Hex Head Screws are specially coated to resist the corrosiveness of the new treated lumber.
Page 3
These instructions are for installation of the Dura-Breeze Screen Room under a Dura-Fold Awning. General Information Throughout these instructions the fl oor of the room is referred to as “deck”. The quality of the fi nished job is best when the deck is level and every effort should be made to level the deck, if necessary.
Page 4
Installing Front Wall Panels 1. Refer to your Wall Layout Diagram and the positions for the numbered panels. Locate Panel #1. (The numbers are on the bottom of the Wall Panels.) 2. Starting at either front corner, loosen the black knob on each post. Then raise the front edge of the Awning at least 3/4”, but not more than 1”.
Page 5
8. Secure the Right and Left Corner panels and (when installed) the Door Panel. Use Anchor Angles supplied in Hardware Package. Position the Angle fl ush to the inside of panel frame. Hold wall panel snug against post while installing Anchor Angle. See Drawing. 9.
Page 6
4. Refer to your Wall Layout Diagram to identify the Side Panels for the Front Corner. Align the fi rst panel with the chalk line on the deck. Then slide it toward the Front Corner until it hits the awning. Then measure distance ‘A (see Drawing) from bottom of the vertical ‘U Channel of the Front Wall Panel to the front edge of the Wall Panel.
Page 7
14. Repeat process for other side wall. Preparing and Installing Gable Panels 1. The 24” x 96” panel received with your Dura-Breeze Screen Room must be cut into two pieces to match your roof pitch. Before proceeding, make sure roof is fi rmly seated on the front Wall Panels.
Page 8
Stop and raise Awning enough to install Gable. Lock in position. 3. Locate Gable Panel Top Cap. Measure diagonal edge of the Gable Panel and cut the Cap to that length. Place Cap on Panel and mark the excess Cap material at the front end of Cap. Remove Cap and make necessary cuts on the Cap.
Need help?
Do you have a question about the Dura-Breeze and is the answer not in the manual?
Questions and answers