MOUNTING IPVT10 TO CABINET:
Users can install the IPVT10 in a 19-inch cabinet that conforms to the IEC
(International Electro-Technical Commission) 60297 standard.
• The IPVT10 server is heavy and we suggest to carry it by two people at
least.
• The cabinet has been installed and we suggest a space of at least "2U"
(1U=44.45mm) needs to be reserved.
• Users can select the regular rail for installation, or optional installation
(Rails and Rail Holders are not included within the package contents).
Users need to follow the steps below to mount IPVT10 to Cabinet:
1. Remove the rail holder and the rails by loosening the 4 screws first, and
then removing the front and back rail holders.
2. Install the inner rail to the server case. Pull the inner rail out of the rail until
it cannot be pulled.
3. Fix the inner rail with 2 screws to the server case. Fit the smooth surface
of the inner rail to the side of the server case, and match the screw holes
on the inner rail with the screw holes on the server case. Hold the inner rail
tightly against the server case and tighten with the screws.
4. Repeat steps 1 to 3 to install the other inner rail on the other side of the
server case.
5. Install the rail holder to the cabinet. Make sure the installation position of
the front rail holder on the cabinet, align the two fixing holes between the
rail holder and the cabinet corner, tighten the screws. Then, according to
the depth of the cabinet (the depth of the cabinet is 650mm), adjust the
back rail holder properly, and align the two fixing holes between the back
rail holder and the cabinet corner at the back of the cabinet, tighten the
screws. (Note: Please make sure that the front and back rail holders are
horizontal.)
6. Repeat the above steps to install the other front and back rail holders to
the cabinet. (Note: Please make sure that the left and right side rails are
horizontal)
7. Lift the server up and close to the cabinet so that the back of the server
faces the front of the cabinet. Insert the inner rails on the two sides of the
server into the front and back rail holders on the cabinet, align the fixing
holes and tighten the screws.
8. When the installation is completed, push the server into the cabinet.
~ 5 ~

EQUIPMENT SETUP:

FRONT PANEL

1
2
3 4
5
6
7
NO.
Name
NO.
Name
Equipment
1
4
Hard Disk Indicator
Switch
Network Connection
2
Reboot Switch
5
Indicator
Ethernet Interface
3
Power Indicator
6
Indicators

BACK PANEL

550W
ROHS
550W
1
2
3
4
5
NO.
Name
1
Power Supply interfaces
2
IPMI Interface
3
COM Interface
4
USB 2.0 Interfaces
8
9
NO.
Name
7
Failure Indicator
8
USB 2.0 Interface
9
USB 3.0 Interface
6 7
8
NO.
Name
5
USB 3.0 Interfaces
6
Ethernet Interface 1
7
Ethernet Interface 2
8
VGA Input interface
~ 6 ~