Download Print this page

Unpack And Check Contents - Harbor Freight Tools Central Machinery 5402 Assembly & Operating Instructions

Load leveler 2 ton capacity

Advertisement

Bracket Body (#6)
Insert Chain to
mid-point
Never force the tool or attachment to do the work of a larger industrial tool. It is designed to do the job better
and more safely at the rate for which it was intended.
Refer to the Parts List on page 4 and the Assembly Diagram on page 5 to assist you with Operation and
Assembly instructions.
The Load Leveller can be used in combination with such tools as a Shop Crane or Overhead Hoist.
Warning:
Never stand under an object that is being lifted. Be aware of the possibility of a
load slipping off of a hook or hoist. An item that falls from the Load Leveller may cause
serious injury.
Step 1)
Attach the Hanging Block (part #8) to the Crane or Hoist to be used.
Step 2)
Secure the load to be moved to the Steel Chains (part #19) at each end of the Bracket Body
(part #6).
Step 3)
Turn the Handle (part #1) to move the load to its balance point, so that it is hanging evenly
from the Load Leveller. As you turn the Handle, the Hanging Block will move to either side of
the Bracket Body.
When unpacking your Load Leveler-2 Ton Capacity, check to make sure the following parts are included. If
any parts are missing or broken, please call HARBOR FREIGHT TOOLS at 1-800-444-3353.
Parts List - #5402
Part # Description
1
Handle
2
Guide Screw
3
Sleeve
4
Spacer
5
Brass Spacer
6
Bracket Body
8
Hanging Block
10
Rolling Wheel
#5402
Figure 1-Your Load Leveler

UNPACK AND CHECK CONTENTS

Quantity
Part # Description
1
1
1
4
2
1
1
1
Operation
Unpacking
Quantity
11
Shaft
12
Rolling Wheel
14
Bolt
15
Nut
16
Lock Nut
17
Lock Pin
18
Spacer
19
Steel Chain
Hanging Block (#8)
Handle (#1)
1
1
1
1
1
1
1
2
Page 4

Advertisement

loading