Do you have a question about the WaterBox and is the answer not in the manual?
Questions and answers
Summary of Contents for CB Tech WaterBox
Page 1
CB Tech WaterBox™ Mobile Water Filtration System Operation Manual CB Tech Tel: 866.622.9373 7251 Cathedral Rock Drive www.CarbonBlockTech.com Las Vegas, NV 89128 sale@CarbonBlockTech.com 01411 Rev - Page 1 of 20...
Page 2
QUICK START GUIDE REFER TO THE FOLLOWING PAGES FOR DETAILED INSTRUCTIONS Hose Connections CONNECT 25’ (7.6 m) INLET HOSE CONNECT FLOAT AND PLACE CONNECT 10’ (3m) OUTLET HOSE IN WATER SOURCE Power Connections CONNECT 110V/230V GFI CONNECT GFI PLUG TO PRESS “TEST”...
Page 3
TROUBLESHOOTING SYSTEM DOES NOT RUN: 1. CHECK POSITION OF POWER SWITCH ON ELECTRICAL CONTROL PANEL 2. VERIFY POWER SOURCE VOLTAGE MATCHES SWITCH SETTING 3. FOR AC POWER (120 VAC/230 VAC) CYCLE THE GFI SWITCH (PRESS “TEST” BUTTON THEN “RESET” BUTTON) 4.
III. List of Symbols and Abbreviations ................ 5 IV. Technical Specifications ..................6 V. System Overview ....................7 VI. Using the CB Tech WaterBox™ Filtration System ........... 8 A. Unpacking ......................8 B. Power Connections .................... 9 C. Operating the CB Tech WaterBox™ ..............11 D.
This manual describes how to install filter cartridges, start the system, monitor and maintain the system and how to shut it down. It is important that the user is familiar with the entire contents of this manual to ensure that the CB Tech WaterBox™ is operated safely and properly.
IV. Technical Specifications System 76 lbs (30.4 kg) System weight 83 lbs (33.6 kg) 24.9 in x 23.7 in x 13.1 in Exterior dimensions (L x W x D) (63.2 cm x 60.2 cm x 33.3 cm) Electrical requirements Voltage 12/24 VDC or 120/230 VAC Priming 8 ft (2.4 m)
V. System Overview The components of the CB Tech WaterBox™: Item Description Item Description Nanomesh™ Stage I Filter #1 Spare Filter Cartridge Storage Nanomesh™ Stage I Filter #2 Raw Water Intake Port Nanomesh™ Stage II Filter 12 VDC/24 VDC Power Cable...
VI. Using the CB Tech WaterBox™ Filtration System A. Unpacking 1. Upon receipt of the CB Tech WaterBox™, inspect the unit for any sign of damage that may have occurred during transport. If damage is found, please report this immediately to the shipping company and CB Tech.
B. Power Connections Multi-Voltage Power Supply DC Power Connection Ports Power/Voltage Selector Switch (Center – Off) Identification Label Power Light Figure 1: Multi-Voltage Power Supply WARNING: Shock Hazard. Do not expose the multi-voltage power supply to water such as rain, snow or spray. Do not operate with power supply cover removed.
Page 10
Output short circuit protection. DC Source Voltage 1. When using a DC power source, lift the protective cap for the desired voltage (12 VDC or 24 VDC) connection. Plug power cord or cigarette lighter adapter into receptacle by aligning detent with plug, inserting into receptacle and securing by twisting the locking ring clockwise.
C. Operating the CB Tech WaterBox™ 1. Install the two (2) CB Tech Nanomesh™ Stage I filters in the Stage I housings (closest to pump) and the CB Tech Nanomesh™ Stage II filter in the Stage II filter housing (farthest from pump).
Page 12
4. Confirm that the CB Tech WaterBox™ electrical switch is in the “OFF” position and connect it to the power source. 5. Place the discharge hose in the desired location and open the discharge valve to enable the priming process.
Page 13
Stage I filter #1’s housing assembly will aid in the priming process (see Figure 7). If this fails, it may be necessary to reduce the vertical distance between the CB Tech WaterBox™ and the water source, or use the one-way valve attachment (Figure 8) to manually prime the system.
5. Place the intake line into the supplied water at ground level. 6. Turn on the WaterBox™, press the pressure relief valve on the first Stage I filter housing to purge the air, and allow the line to be primed. All air must be purged from the line including the internal lines connected to the pump.
Page 15
2. With the suction hose disconnected from the WaterBox™, allow the pump to run until all water is flushed out of the three filter housings. This system flush may take several minutes to complete. 3. Disconnect the electrical power to the system.
Page 16
Filter Replacement Interval CB Tech Nanomesh™ Stage I Filter: The working life of the Stage I filter in the CB Tech WaterBox™ depends upon the amount of total organic carbon (TOC) and suspended solids in the source water. The Stage I filters should be changed when the system pressure gauge decreases by 10 psi below the initial starting pressure.
In this case, contact CB Tech for system service. E. System Shutdown and Storage 1. When you are finished using the CB Tech WaterBox™, switch the power to the OFF position and unplug the power cord from the power source. Remove hoses and open valves to allow them to drain.
Confirm that the suction and discharge hoses are free from obstruction. Waterbox Confirm that all of the air is bled from the system. produces less Confirm that the pump intake strainer is clear of debris. If than 0.5 gpm...
Detailed feedback from users in the field on the performance of the CB Tech WaterBox™ helps with continued improvements. Please share your experience of using this product with CB Tech along with any suggestions or opinions that would help with future improvements to its operation.
ADVISED OF THE POSSIBILITY OF SUCH DAMAGES, REGARDLESS OF THE FORM OF ACTION, WHETHER CONTRACT, TORT (INCLUDING NEGLIGENCE), STRICT PRODUCT LIABILITY, OR OTHERWISE. In no event shall CB Tech’s aggregate liability arising in connection with a product exceed the price paid to CB Tech for such product.
Need help?
Do you have a question about the WaterBox and is the answer not in the manual?
Questions and answers