DRYROLL
INSTALLATION INSTRUCTIONS
You will need
Power drill, drill bit ø2mm (1/16"), cross headed screwdriver, jigsaw,
scissors, pencil and sealant.
Surface mounting instructions
1
Use the surface mounting template to check the position and clearance of the Dryroll.
2
Mark the centre of hole A and pre-drill the wall.
3
Drill through screw holes B in the back of the Dryroll
4
Fit a screw into the wall at position A and tighten it leaving a 3mm (1/8") gap between the head of the screw and the wall. Fit the
Dryroll onto this screw and push down lightly to ensure that it holds. You may need to remove the Dryroll and tighten or loosen the
Once the Dryroll hangs securely on hole A check that the Dryroll is level and then mark both B holes (to access the holes open the
5
door half way). Remove the Dryroll and pre-drill the B holes.
6
Recessed Instructions
Ensure there is a minimum clearance of 75mm (3") inside the wall
1
Fit the frame onto the body from the back by pulling the sides of the frame out and hooking the circular features into the recesses
2
located in the side walls of the body. It is easier to do this with the door half open.
3
4
5
6
7
should be applied from the back.
Toilet Roll Fitting
diameter of less than 38mm (1 1/2"), an outer diameter of more than 120mm
(4 3/4") or a width greater than 115mm (4 1/2") should be avoided.
Care & Maintenance
www.oceanair.co.uk/distributors.
www.oceanair.co.uk