Page 1
· All information is based on the latest product information available at the time of publication. Kohler China Ltd. Reserves the right to make changes in product characteristics, packaging, or availability at any time without notice. NOTES Observe all local plumbing and plumbing codes.
K-7147T K-7169T 38.1 Fig.#1 Kohler reserves the right to change marked dimensions without prior notice. INSTALLATION Insert strainer into the gasket, position plain gasket between the drain ell and the bottom of the bath. Turn the strainer into the drain ell.
Page 3
Drain Stopper Insert the drain stopper into the drain ell. Adjust drain Drain Tube stopper to make end of lift toggle assembly near to but not touch the top of the drain tube, as shown. To adjust the stopper height, remove the stopper and loosen the nut below the stopper.
Page 4
FOR HORIZONTAL DRAINAGE INSTALLATIONS: Assemble parts as shown. Align the parts with the tee, Tube as shown. Insert the tubes into the tee. Align and tighten the nuts. Attach the tail piece to the tee, and tighten. The tail Nuts piece may need to be cut for proper fit.
Page 5
Lift Rod Assembly When the cover assembly is lifted up, the drain stopper should rise approximately 3/8 (10mm) above the " stainer. If sufficient clearance cannot be obtained, remove the lift rod assembly. Loosen the screw, and slide the adjusting block up on the adjusting rail to Adjusting Rail increase the clearance, or down to decrease the Screw...
Page 6
K-7147T/K-7169T 1215449-* Drain Handle Kit 1207694-** Drain Stopper 1207695 1207697 1207696-** Lift Toggle Assy., Lift Toggle Assy., Lift Rod Assy., For K-7147T For K-7147T For K-7169T K-7147T K-7169T K-7147T 1207698-** Lift Rod Assy., For K-7169T K-7169T -** include: -** -CP-Polished Chrome -...