Page 2
1" Clip Screw (Metal Posts/Walls) Slide Panels onto Insert Channels Slide the right and left Tuscany stall front panels over the insert channels and adjust the width between the door posts to achieve 48”. 48” Tuscany Stall Front Installation Instructions...
Page 3
SS1 screws through holes in the bottom channel. Place the wood cover plate over the cutout in the bottom channel on the back of each stall front panel and fasten to boards with supplied SS1 screws. Tuscany Stall Front Installation Instructions...
Page 4
Grilled Doors with Arrows: Cut horizontal boards to length and fit into “arrow” openings. Fasten with SS1 screws through holes in “arrows” in front of door. NOTE: Drilling pilot holes in boards will reduce splitting. Tuscany Stall Front Installation Instructions...
Page 5
Note: The item used as the “blocking pin” may get bent during tightening. Remove nut and washer on Subassembly B. Slide door onto Subassembly B and attach washer and nut. 1/2” 1/2” Adjust hinges to achieve approximately 1/2” equal spacing on both sides of door. Tuscany Stall Front Installation Instructions...
Page 6
Thread finial studs onto finial and twist until finial stud bottoms out. Thread finials and studs onto door posts until finials are snug and secure to top of door post. Tuscany Stall Front Installation Instructions...