Download Print this page

GE Arize Element Series Installation Manual page 4

Top light horticulture led lighting system

Advertisement

Always wear safety gloves while handling light modules.
Installation
Hanging the Light Module
A
1
Install the support cables
A) At first end of light module, wrap non carabiner
end of support cable around structural member.
B) Pass carabiner through support cable loop to
create a noose.
Repeat with second support cable at other end of
light module.
NOTE: Ensure greenhouse structures and members are rated for loads created by light modules and drivers.
Suitable min. 2 mm diameter suspension cable required to complete installation.
Hanging the Driver
3
Lift driver so that the structural member is
between the brackets.
NOTE: The base driver mounting kit is for a 1 5/8'' square structural member. For other structural
members, see accessories or contact your account manager.
CAUTION / ATTENTION
Structural member
B
Driver output
Portez toujours des gants de protection lorsque vous manip-
ulez les luminaires.
A
2
Install the light module
A) Attach first carabiner to the 1/4'' round hole
on one side of the light module. Repeat on
other side of light module.
B) Ensure both carabiners are through the hole
and both gates are closed.
4
Rotate driver so that the brackets can engage
with the structural member. Lower driver into
position.
4
B

Advertisement

loading

This manual is also suitable for:

Arize element gehtl-hppb4-2nx1Arize element gehtl-hppr4-2nx1Arize element gehtl-mppb4-2nx1Arize element gehtl-mppr4-2nx1Arize element gehtl-hppr4-3nx1Arize element gehtl-hppb4-3nx1 ... Show all