Download Print this page
In2 Networks Energy ICM Quick Start Manual

In2 Networks Energy ICM Quick Start Manual

Advertisement

Quick Links

In2 Networks Energy ICM Quick Start
In2
Networks
Energy ICM
Quick Start
Quick Start Guide
For the In2 Networks
Internet Control Module
Rev 1.02
August 2007
The complete setup documentation can be found on the web at:
www.in2nets.com/support
In2 Networks • 79 West 4500 South, Suite 15, Murray, UT 84107 • 801.685-8778 •
www.in2nets.com
In2 Networks Energy ICM Quick Start
Quick Hardware Installation
Follow these steps to install the Internet Control Module (Energy ICM):
1. Install the ICM. Attach the Energy ICM to the wall near the
EnviraCom Equipment Interface Module which is normally
installed near the heating or cooling equipment in the mechanical
room. The Energy ICM can also be mounted near the structured
wiring panel, and connected to the Equipment Interface Module
using standard HVAC wiring. Use caution when installing the
ICM enclosure to avoid damage to the PCB.
2. Connect the HVAC wiring. Connect HVAC wiring between the
Energy ICM and the Equipment Interface Module. Be sure that
pin 1 on the Energy ICM connects to pin 1 on the EIM, pin 2 to
pin 2, and pin 3 to pin 3. Some patriotic HVAC contractors use
the wiring color code Red, White and Blue for pins 1, 2 and 3.
3. Plug in the Ethernet cable. Plug one end of the network cable
into the RJ-45 on the Energy ICM. Connect the other end to the
network router (or a network attached hub or switch).
4. Connect the Power Supply. Plug the included 12V DC 300mA
AC adapter into a nearby 120V AC outlet. Plug the other end
into the ICM power connector.
Be sure to follow any local codes and standard practices for installing a
low voltage device.
In2 Networks • 79 West 4500 South, Suite 15, Murray, UT 84107 • 801.685-8778 •
www.in2nets.com

Advertisement

loading

Summary of Contents for In2 Networks Energy ICM

  • Page 1 2. Connect the HVAC wiring. Connect HVAC wiring between the Energy ICM and the Equipment Interface Module. Be sure that pin 1 on the Energy ICM connects to pin 1 on the EIM, pin 2 to pin 2, and pin 3 to pin 3. Some patriotic HVAC contractors use the wiring color code Red, White and Blue for pins 1, 2 and 3.
  • Page 2 X. In2 Networks • 79 West 4500 South, Suite 15, Murray, UT 84107 • 801.685-8778 • In2 Networks • 79 West 4500 South, Suite 15, Murray, UT 84107 • 801.685-8778 •...