ATTACK SOLARTHERM HSA 200 Manual

Parallel mounting brackets on the roof

Advertisement

Quick Links

SOLAR TECHNIQUE
ATTACK® SOLARTHERM HSA 200
PARALLEL MOUNTING
BRACKETS ON THE ROOF
W W W . A T T A C K . S K

Advertisement

Table of Contents
loading

Summary of Contents for ATTACK SOLARTHERM HSA 200

  • Page 1 SOLAR TECHNIQUE ATTACK® SOLARTHERM HSA 200 PARALLEL MOUNTING BRACKETS ON THE ROOF W W W . A T T A C K . S K...
  • Page 2: Table Of Contents

    Content Safety warnings ........................4 Shipping instructions ......................5 Installation instructions ......................6 Tools Overview ........................7 Material Overview ........................8 Recommended mounting points ....................10 Parallel mounting brackets on the roof .................. 11 Specifications ........................17 Recommendations for service ....................18 Warranty ..........................
  • Page 3: Safety Warnings

    Safety warnings In the case of mounting on the roof - before the work – it is essential to install compliant independent protection against falling or catching device according Safety harness must be preferably nailed above the to DIN 18338 on roofing work on the roof and sealing user.
  • Page 4: Shipping Instructions

    Shipping instructions Attention: Do not lift the collector for the connector or a threaded screw connections!
  • Page 5: Installation Instructions

    Installation instructions General warnings and warnings of carriage The mounting system is only suitable for roofs with tiled roofing. Installation can be performed only by specialized personnel. All work in this guide apply only to such specialized personnel. When installing in principle be used the supplied material.
  • Page 6: Tools Overview

    Tools Overview Measuring tape Drill Allen handpiece Hexagonal wrench Angle Grinder Hammer Ratchet with extension...
  • Page 7: Material Overview

    Material Overview Roof Mount Roof mount bracket Screw 6*60 Screw hinges M8*25 Self-locking hex nut M8 Clamp Clutch bearing profiles Mounting flange Mounting bracket Wascher M8 T Bolt M8x25 Hexagon nut M8...
  • Page 8 Carrier rail Mounting template Gasket...
  • Page 9: Recommended Mounting Points

    Recommended mounting points Mounting Collectors Total length points 239 cm 361 cm 482 cm 603 cm 724 cm In areas with large snowfall or high wind areas, it is necessary to schedule additional fasteners! (DIN 1055 follow eventually. Of force in the country).
  • Page 10: Parallel Mounting Brackets On The Roof

    Parallel mounting brackets on the roof General Warning: Points 8 - 11, 16 and 17 are needed only for installation of more than two collectors! 1: The vertical dimension of the collector -> A = 125 - 155 cm 2: Focus attachment points (see recommendation from previous page), remove the slate / roofing Generally: for one collector is needed one Fasteners.
  • Page 11 5: The roof mount insert screws with a flat head and tighten them first hand only. Order: screw with a flat head - roof mount - washer – nut 6a ) 6: Install the lower bearing rail (6a, 6b) Order: Bearing rail – screw with a flat head - roof mount - washer - nut 6b ) 7a )
  • Page 12 7b ) Attention: The upper and lower bearing rail must fit together perfectly straight and parallel! 8: Install additional mounting points under 1 – 4. 9: Push and pull terminal extension until the middle of the inner matrix of the bearing rails (top and bottom). Order: Bearing rail - terminal extension - washer –...
  • Page 13 11a ) 11: Attach the bearing rails (top and bottom) with roof bars or terminal extension. Order: Bearing rail – screw with a flat head - roof mount washer – nut 11b ) 12a ) 12: Hang the first collector to the lower bearing rail and straighten it (12a + 12b!).
  • Page 14 13 ) 13: Place the clamp on the upper bearing rail and tighten them first hand only. Order: Top bearing rail – screw with a flat head - washer - clamp - washer – nut 14a ) 14: Hang the second collector. (Dimension A = dimension B in FIG.
  • Page 15 16 ) 16: For each affecting bearing rails slide and place the mounting part extending into the upper bearing rail. 17 ) 17: Install additional terminal / other collectors, according to point 12 – 16. 18 ) 18: Replace the fixing unit to the left and right upper end of the collector box.
  • Page 16: Specifications

    Specifications 2,02 Gross area Weight 1,84 Capacity Net area Maximum operating 1,91 Surface hole pressure 1221 1170...
  • Page 17: Recommendations For Service

    Recommendations for service Rinsing and performance For security reasons, the device must perform when collectors are not exposed to sunlight, where it is necessary to cover collectors. Especially in areas where there is danger of frost, facility has to be filled with a mixture of water containing up to 40% of frost protection.
  • Page 18 Link collector A possible link can be seen in the attached sketch. Based on the structural characteristics of the situation, however, may be different in practice. If the collector field consists of more than 6 collectors (vertically aligned) or 4 collectors (arranged horizontally) in the series, it is necessary to plan appropriate measures to compensate for thermal expansion due to temperature fluctuations (expansion bends or flexible pipe) or a field to be multiple times in parallel run.
  • Page 19: Warranty

    Warranty For cases using the device for the purpose for which it is not intended or alterations assembly components and the consequences resulting from such proceedings are not covered by warranty. All information and instructions in this guide apply to the current state of development. Please always use the appropriate assembly instructions supplied with collectors.
  • Page 20 • ATTACK, s.r.o. producer reserves the right to change technical parameters and dimensions of boilers without previous warning. • Der Hersteller ATTACK, s.r.o. behält sich das Recht der technischen Veräderungen an Produkten ohne eine vorige Warnung. • Изготовитель ATTACK, s.r.o. оставляет за собой...