McCue Corporation
Walkway Bollard
Installation Instructions
•
String Line or similar
•
Spirit or Bubble Level
•
Tape Measure
•
Marking Pen or Pencil
Assembly
BOLLARD
SLEEVE
FRONT
Identify the intended bollard location(s) using the Tape
Measure and String Line, and mark for excavation.
Check with site agents and managers before proceeding to ensure
they agree with the bollard location(s). If the floor is not finished,
enquire about the thickness of the finished ground-works, be it
tarmac, concrete or paving stones.
REV20100422
•
Appropriate Excavation Tools for
bollard hole
•
Concrete Mixing Tools including
water
REFLECTIVE
STRIP
RIVETS
Figure 1
BACK
McCue Corporation | 35 Congress Street, Suite 150, Salem MA 01970
Phone: 800.800.8503 or 978.741.8500 | Fax: 978.741.2542 | www.mccuecorp.com
© 2010 McCue Corpotation
•
80lb bag of 4000 psi Concrete
•
25lb bag of Sand
•
Damp Cloth
TARMAC OR
CONCRETE
In The Box
Discription
1 Walkway Bollard/
Sleeve Assembly
34 cm
Check to ensure the WalkWay Bollard arrived fully
assembled and undamaged. A fully assembled
unit can be seen in Figure 1.
Bollard and Sleeve components are locked
together, DO NOT try to separate.
Quantity
Part Number
1
BOL-WALKWAY
GROUND
GROUND
BOLLARD
SLEEVE
Figure 1a
Pg. 1
\\Mccue-san1\Shares\us\MKT\Intallation Instruction Source Files\CartStop\WalkWayBollard\WalkWay Bollard Installation Instructions.indd
SIDE
CUT-AWA
EXCAVATE
HOLE
25 cm
[ 10 in ]
FRONT
Need help?
Do you have a question about the BOL-WALKWAY and is the answer not in the manual?
Questions and answers