Do you have a question about the 6057-C and is the answer not in the manual?
Questions and answers
Summary of Contents for USC 6057-C
Page 1
6057-C Nitro Fuzer Welding Cart Quick Start Guide Initial Setup: Unbox cart and remove accessories from box. Find the hot air welder and airless welder ps and screw them into to the hea ng elements. Install your shop’s quick disconnect plug into A short whip hose may be a ached at the the bo om inlet port of the cart’s air mani-...
Page 2
Start-Up Procedure: Connect clean, dry, oil-free shop air to air Set inlet pressure regulator on back of the inlet. Supply pressure should be set between welder to 15 psi. 60-120 psi. Adjust fi ne fl ow control on the air (le ) side Adjust hot air temperature control to Level 1 to so the fl...
Page 3
Adjust fi ne fl ow control on the nitrogen (right) 10. Switch the air selector back and forth between air and nitro- side so the fl ow meter reads 15 LPM. You should gen, making sure that the yellow lights indicate which side is feel nitrogen gas coming from the torch.
Page 4
Shutdown Procedure: The shutdown procedure is VERY IMPORTANT for maximizing the life of your hea ng element. You MUST shut down power to the unit fi rst, then let clean, dry, oil-free air fl ow un l the hea ng ele- ment is completely cool.
Need help?
Do you have a question about the 6057-C and is the answer not in the manual?
Questions and answers