HORIZONTAL BIKE RACK - INSTALLATION STEP #1: CHECK PARTS RECEIVED. STEP #2: INSTALL EXTENSIONS AND HOLDERS AS SHOWN. USE SCREWS 1/2 LG & NUTS. SELECT THE POSITION OF THE HOLDERS BASED ON BIKE FRAME SIZE TO BE STORED. THIS RACK “LOCKS” INTO THE SLATWALL SO IT WILL NOT BE PULLED AWAY FROM THE WALL WHEN A BIKE IS REMOVED FROM THE RACK.
Page 3
INSERT INTO PANEL RAISE LEFT ARM INTO SLOT RAISE RIGHT ARM FIND SLOT SNAP INTO SLOT COMPLETE PG 3 REV 1, 7/11...
Page 4
STEP #3: REMOVED FROM PANEL AFTER TESTING FOR CORRECT SCREW / NUT TIGHTNESS AND USE THE QUANTITY 4, 5/8 LG SCREWS TO FASTEN COVER ONTO RACK. COMPLETE – REINSTALL ON PANEL AND MOUNT BIKE. PG 3 REV 1, 7/11...