This guide provides brief setup and user instructions to quickly allow the operator to start using the
Pressable Ceramic Firing Programs # 0 through 19 for VIP Universal X-Press Furnace operation.
For more detailed information, refer to the Instruction Manual supplied with the furnace.
WARNING:
Connect the VIP Furnace to an individual branch circuit. The overall circuit power rating must
be 15 amps minimum for the 120-volt model and 10 amps minimum for the 230-volt model. No
other devices shall be connected to the circuit powering the VIP Furnace.
Set Up
1. Install cooling tray, if necessary.
2. Connect vacuum pump.
3. Connect compressed air line.
4. Connect input power line cord.
5. Turn on power. Observe that the door opens (lowers).
6. Place firing block with ring insert in place on to door platform.
Important: Run the muffle conditioning program whenever furnace has been off,
Muffle Conditioning
Run muffle conditioning program # 400 two times as follows:
1. Press the PROGRAM SELECT key.
2. Enter digits 4 0 0 and press the ENTER/REVIEW key.
3. Press the START key.
COOLING TRAY
FURNACE DOOR
©
2006 Air Techniques Inc.
PN A4124, Rev. A
Q u i c k S t a r t G u i d e
cooled down and then turned on.
Figure 1. VIP Furnace Setup
VACUUM PUMP
HOSE
CONNECTION
COMPRESSED
AIR HOSE
CONNECTION
VACUUM PUMP
POWER
SOCKET
POWER
LINE CORD
CONNECTOR

Advertisement

loading

Summary of Contents for Jelrus VIP Universal X-Press

  • Page 1 This guide provides brief setup and user instructions to quickly allow the operator to start using the Pressable Ceramic Firing Programs # 0 through 19 for VIP Universal X-Press Furnace operation. For more detailed information, refer to the Instruction Manual supplied with the furnace.
  • Page 2 Program Parameter Display Section Status Display Section LCD Digital Display 20-Key Front Panel Keyboard NITE Mode LED Figure 2. VIP Furnace Controls and Indicators Location Programming Pressable Ceramic Firing Programs # 0 through 19 1. Enter information for pressable programs (#0 - 19) via front-panel keyboard shown by Figure 2. 2.