(866) 998-3625
Special Notes: Improper installation-assembly, or overloading PWC lift
beyond rated capacity will void manufacturer's warranty. Electrical
connection MUST be grounded with a GFCI device. Proper line voltage
only. No Generators!
Generator use will void motor's warranty!
*NOT FOR LIFTING/LOWERING HUMANS
Cover 09/07/2017

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Up-N-Over and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Boat Lift Up-N-Over

  • Page 1 INSTALLATION INSTRUCTIONS 1,5OO Lb. Capacity FIX MARINE SUPPLY (866) 998-3625 Special Notes: Improper installation-assembly, or overloading PWC lift beyond rated capacity will void manufacturer’s warranty. Electrical connection MUST be grounded with a GFCI device. Proper line voltage only. No Generators! Generator use will void motor’s warranty! *NOT FOR LIFTING/LOWERING HUMANS Cover 09/07/2017...
  • Page 2 1.) (6) ¾” diameter bolts, 3” longer than piling’s diameter, MUST be used to properly mount the Up-N-Over™ to the piling. (not 5/8”, etc. ¾” only!) The “Piling-Mount Bracket” MUST be mounted to piling PLUMB. Failure to do so will result in difficulty to the user when rotating pwc back/forth over the water, and back over the dock.
  • Page 3 Now, using heavy nails hang bracket into place using staggered bolt holes. Be sure bracket is 100% PLUMB! Remember: Up-N-Over™ rotates 180°, so be sure to choose the correct orientation for this! Refer to photo on cover of this manual.
  • Page 4 Step 2 – MAST installation 1.) Insert heavy-duty aluminum mast into the HEAD ASSEMBLY. Note: Be sure to orient the mast correctly in the HEAD ASSEMBLY so that the holes align with mast’s cradle arm bolt holes. Step 3 – HEAD ASSEMBLY to PILE MOUNT HEAD ASSY SWIVEL PIN 1.) With the mast positioned into the HEAD ASSEMBLY,...
  • Page 5 Step 4 – CONNECT MAST to CRADLE ARM 1.) With CRADLE ARM in position on deck, raise mast up a foot or two, and slide underneath. Finally drop MAST into the CRADLE ARM and fasten with supplied ½” stainless bolts (total of 3). Step 5 –...
  • Page 6 Step 6 – Connect stainless CABLE to CRADLE ARM 1.) With cable wound over the cable-winder drum, as shown in photo on bottom of page 4, connect cable to CRADLE ARM using the supplied ¾” stainless bolt: Step 7 – Aluminum BUNK attachement. 1.) Assemble the Aluminum Bunks to their brackets at shown here: 2.) Then, mount the...
  • Page 7 Step 8 – Aluminum GUIDE POST attachement. 1.) Attach the aluminum GUIDE POST BRACKET to the CRADLE ARM, and secure in place with supplied stainless U-bolt. 2.) Be sure NOT to position GUIDE POST under the motor/GEARBOX assembly! Damage to GEARBOX will result when raising PWC.