BAC Ice Chiller TSC-95C Rigging And Installation Instructions

For external melt, thermal storage unit/coil only

Advertisement

Quick Links

INSTALLATION INSTRUCTIONS
TSU-C/D for External Melt
TSC-C/D for External Melt
The BAC equipment should be rigged and installed as
outlined in this bulletin.
These procedures should be thoroughly reviewed prior to
the rigging and operation to acquaint all personnel with
the procedures to be followed and to assure that all
necessary equipment will be available at the jobsite.
Be sure to have a copy of the unit certified drawing
available for reference. If you do not have a copy of this
drawing or if you need additional information about this
unit, contact the local BAC Balticare representative. His
name and phone number can be found on the BAC
website: www.BaltimoreAircoil.eu. The model type and
serial number of your equipment are indicated on the unit
nameplate.
RIGGING AND
ICE CHILLER
Thermal Storage Unit
®
ICE CHILLER
Thermal Storage Coil only
®
Table of Contents
General Information
Rigging
Inspection Prior to Start-up
Recommended Maintenance and
Monitoring Programme
R_TSU-C/Dv00 EN
Page
2
4
8
12
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Ice Chiller TSC-95C and is the answer not in the manual?

Questions and answers

Summary of Contents for BAC Ice Chiller TSC-95C

  • Page 1 BAC Balticare representative. His name and phone number can be found on the BAC website: www.BaltimoreAircoil.eu. The model type and serial number of your equipment are indicated on the unit nameplate.
  • Page 2: General Information

    2135 Unit Weights TSC-185C 1065 TSC-230C 1205 TSC-270C 1340 Before rigging any BAC cooling equipment, the weight of each TSC-310C 1590 section should be verified on the unit certified drawing. TSC-350C 1725 Note: These weights are approximate only and should be confirmed by...
  • Page 3 All connections in the external pipework (installed by others) must requirements of the EU machinery directive. Depending upon site be leak free and tested accordingly. All piping external to BAC conditions it also may be necessary to install items such as screens, cooling equipment must be supported separately.
  • Page 4 RIGGING General Notes 1. To simplify rigging and installation, units are shipped in one piece, so only one lift is required. It is important to follow the guidelines listed below when rigging these units. 2. Lifting devices have been provided for short lifts and final positioning.
  • Page 5 RIGGING Rigging method Approx Model L x W Shipping TSU C/D Dimensions (mm) (mm) (mm) weight (kg) RECOMMENDED LIFTING METHOD TSU C/D TSU 95C 3073 x 1308 2550 1597 1124 The recommended method of rigging the unit is shown in the figure. TSU 115C 3683 x 1308 2780...
  • Page 6 REFRIGERANT CONNECTIONS ON SITE TSC-910C 5137 TSC-1050C 4030 All connections in the external pipework (installed by others) must be leak free and tested accordingly. All piping external to BAC TSC-790D 3327 1645 2102 2448 cooling equipment must be supported separately.
  • Page 7 RIGGING Air pump installation The standard BAC delivery consists of a centrifugal air pump (with an inlet air filter), a threaded adaptor and a flexible discharge sleeve to be connected to the customer provided air piping. A non-return valve is shipped loose with the air pump for field installation.
  • Page 8 INSPECTION PRIOR TO START-UP General Prior to start-up, the following services, which are described in detail Operating Maintenance Manual (see Table Recommended Maintenance and Monitoring Schedule- Start-up) must be performed. Proper start-up procedures and scheduled periodic maintenance will prolong the life of the equipment and ensure trouble-free performance for which the unit is designed.
  • Page 9 NOTES...
  • Page 10 NOTES...
  • Page 11 NOTES...
  • Page 12 RECOMMENDED MAINTENANCE AND MONITORING PROGRAMME Schedule Type of Action Action Start-Up Monthly Every Six Months Annually Shutdown Inspections and General condition Monitoring ® ICE CHILLER Tank ® ICE CHILLER Water - Quality - Level Ice Thickness Coil ICE LOGIC Ice Quantity controller : - condition of sensor - conductivity of tank water...