Executive Sanitary Yard Hydrant
Installation and Operating Instructions
Installation
1. It is most important to Flush supply lines before installing
hydrant. Failure to do so may permanently damage sealing surface
causing leaks and possible freeze-ups.
2. Install hydrant so that the Adapter or Bushing is above grade for
servicing. Figure 1.
3. Attach hydrant to supply lines using Te on Tape or an approved
thread sealant for PVC.
4. Do not over tighten PVC portion of hydrant to supply lines as it
will damage hydrant.
Operation
1. No winterization is required to prevent hydrant from freezing.
2. Lift up on lever to turn on, push down on lever to turn o .
3. As hydrant is turned on some water will come out port holes
in vacuum breaker, this is normal.
4. When the hydrant is shut o it will drain to the reservoir to
prevent freezing, even if a hose with pistol grip nozzle is attached.
However, the hose will not drain.
5. DO NOT remove, discard, or bypass Back ow Preventer as
Hydrant will not function properly.
See Maintence: "Field Testing the Back ow Preventer" for further
information on the Back ow Preventer.
7796 Oak Spring Circle, Gilroy, CA 95020 * Ph 408-847-7615 / Fax 408-847-0675
HOEPTNER PRODUCTS
work@garlic.com * www.freeze ow.com
Hoeptner Products
40" OPEN
31" CLOSED
BURY DEPTH
FROST LINE
14"
Figure 1.
1" FIP
INLET
Need help?
Do you have a question about the Freeze Flow and is the answer not in the manual?
Questions and answers