Axial Flood ™ 20 & 30 Series Mounting Options
Installation Instructions
WARNING: Fixtures must be grounded in accordance with local codes or the National Electrical Code.
!
Failure to do so may result in serious personal injury.
MAINTENANCE: A regularly scheduled maintenance program must be established to insure paint coating is
intact, corrosion or structural damage has not occurred, and all mounting arms, rods, nuts and bolts are tight.
Failure to do so could lead to damage or serious personal injury.
Mounting and strength requirements shall be engineered by others.
KEEP THIS SHEET FOR FUTURE REFERENCE.
Wall Mount Tenon - AXF2-WM & AXF3-WM
The wall mount is designed for use with the Axial 20 - 30 Series fixture. It is designed to be used in
conjunction with a Wall Embedment Bracket (WEB), however, it may be attached to any flat surface.
Mounting and strength requirements shall be engineered by others.
Tools Required: ❑ Stubby Flat Blade Screwdriver
Installation Instructions:
supply is OFF before starting installation.
1. Feed field wires through arm mount. Install wall mount
securely using C" bolts into WEB (For WEB Installation
Instructions see P/N 95294)
2. Make all wiring connections observing polarity, i.e.; green-
to-ground, white-to-common, and black-to-voltage.
Attach end cap.
3. Install fixture per fixture installation instructions.
Stanchion Mount Tenon - SM2
The Stanchion Mount (SM2) is made to be set directly into concrete. Inside diameter of stanchion is 3K"
inches and will accommodate up to two (2) 1" diameter conduits. Concrete and soil engineering by others.
Tools Required: ❑ F" Allen Wrench
Installation Instructions:
Make certain the electrical is supply is OFF before starting installation.
!
1. Dig hole to obtain desired mounting height and adequate strength for
local soil conditions.
2. Route conduit as required.
3. Embed stanchion directly into concrete.
4. Fish wires (by others) out through top of stanchion.
5. Install fixture per fixture installation instructions.
9/17/07
ECN 5287
Status 1
P.O. Box 60080 • 16555 East Gale Ave.
City of Industry, California 91716-0080
626/968-5666 • FAX 626/330-3861
❑ N" Socket Wrench
❑ F" Allen Wrench
!
Make certain the electrical
Two (2) C-16 x 1B"
Long Hex Head Bolts
(1) J-20 x
L" Flat Head
End Cap
MOUNTING AND STRENGTH
REQUIREMENTS SHALL BE
ENGINEERED BY OTHERS.
Conduit
( By Others)
CONCRETE AND SOIL
ENGINEERING BY OTHERS
SM2
SMT
AXF2-WM
AXF3-WM
AXF2-MTM2B
AXF3-MTM2B
AXF2-MTM3E
AXF3-MTM3E
AXF2-STM-2B
AXF3-STM-2B
AXF2-STM-3E
AXF3-STM-3E
J-Box
(By Others)
Wall Embedment Bracket
(WEB see Installation
Instructions P/N 95294)
2" Pipe Tenon
(2C" O.D.)
Part No. 93014415
Need help?
Do you have a question about the SM2 and is the answer not in the manual?
Questions and answers