PARTS INCLUDED
Installation
Clamp
flange
STEPS BEFORE FLOOR FINISH
Step 1:
A. With the help of the bathtub apron or
the optional template, mark the center
of the drainage line in relation with the
desired position of the bathtub.
B. Drill a hole (diameter between 4½''
and 6'') to the floor in the previously
marked position.
Step 2:
A. Insert the female side of the slip joint
until the shoulder of the mounting
flange and tighten the clamp
B. Temporarily insert the slip joint's
male part inside the F² drain and
insert the prevention cap.
C. Use aligning guide points to position
the flange adjusted parallel to the
adjacent wall. Fasten the flange in
the floor.
D. Finish connecting to the plumbing
drain line under the floor. Paste as
recommended by the plumbing code.
Step 3:
A. Using the template or the bathtub skirt
trace the inside rim of the skirt. Use this
line as minimal limit for tile installation.
male
end
female
end
Slip joint
(Female-female)
1A
Shoulder
.
2A
Slip joint
(Female)
Customer Service (800) 945-2726 • www.aquaticbath.com
W1AX6032FTO, W1AX6636FTO, W2AX6032FTO, W3AX6042FTO,
Prevention
Drain adapter
cap
(use if required)
Floor
Desired bathtub position
Installation flange
Clamp
Slip joint
(Male)
Top view
— 1 —
Installation Instructions
2
F
DRAIN
FOR USE WITH AQUATIC 2-PIECE FREESTANDING BATHTUBS
W3AX6636FTO, W4AX6032FTO, W4AX6636FTO
F² Drain video
Drain position
Prevention cap
Aligning guide points
2B
Top view
2C
Inside of the tub
Outside of the tub