AVANT A21406 Operator's Manual

Concrete mixing bucket.

Advertisement

Operator's manual for Attachment
Operator's
Operator's
Operator's
Concrete Mixing Bucket
Product number:
Please read this manual carefully before using the equipment, and follow all
instructions.
Keep this manual for later reference.
manual for Attachment
manual for Attachment
manual for Attachment
500-700-series loaders:
Concrete mixer bucket 2012 1
A21406

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the A21406 and is the answer not in the manual?

Questions and answers

Summary of Contents for AVANT A21406

  • Page 1 Operator’s manual for Attachment manual for Attachment Operator’s Operator’s manual for Attachment manual for Attachment Concrete Mixing Bucket Product number: 500-700-series loaders: A21406 Please read this manual carefully before using the equipment, and follow all instructions. Keep this manual for later reference.
  • Page 2: Table Of Contents

    Concrete mixer bucket 2012 1 CONTENTS Foreword............................3 Designed purpose of use ......................3 Safety instructions for the concrete mixer...................3 Concrete mixer specifications ....................5 Assembly of the concrete mixer ....................6 5.1. Attaching the concrete mixer bucket to the loader................7 5.2. Storage of the bucket ......................... 8 5.3.
  • Page 3: Foreword

    3(16) 1. Foreword Avant Tecno Oy would like to thank you for your purchase of this AVANT attachment. It has been designed and manufactured on the basis of years of product development and experience. By familiarising yourself with this manual and following the instructions, you ascertain your safety and ensure the reliable operation and long service life of the equipment.
  • Page 4 4(16) • Always transport the mixer as low and as close to the machine as possible to keep the centre of gravity low. • When filling the concrete mixer as a normal concrete mixer, keep it securely against the ground and attached to the loader. •...
  • Page 5: Concrete Mixer Specifications

    Wear protective gloves when handling hydraulic hoses. • Wear a dust mask when loading cement or operating in dusty conditions. 4. Concrete mixer specifications Table 1 –Concrete mixer technical data Product number A21406 Total width: 1 590 mm Maximum input of 70 l/min hydraulic energy:...
  • Page 6: Assembly Of The Concrete Mixer

    6(16) Identification plate of the attachment A46771 A46772 A46804 A46798 Table 2 – Decal warning messages Decal Explanation A46771 Read instructions before use. A46772 Do not go under a raised attachment or the loader boom, keep a safe distance to lifted equipment.
  • Page 7: Attaching The Concrete Mixer Bucket To The Loader

    7(16) 5.1. Attaching the concrete mixer bucket to the loader Attaching the attachment to the loader is quick and easy, but it must be done carefully. If the attachment is not locked to the loader, it may detach from the loader and cause hazardous situations. In the worst case, the attachment may slide onto the driver along a raised boom.
  • Page 8: Storage Of The Bucket

    Connecting and disconnecting the hydraulic couplings The attachment is equipped with either standard quick couplings or the multiconnector system. If you want to change the type of the hydraulic couplings, contact your Avant dealer or service point for instructions or installation services.
  • Page 9: Instructions For Use

    9(16) Disconnecting the hydraulics: Before disconnecting the fittings, lower the attachment on solid and level surface. Turn the control lever of the auxiliary hydraulics to its neutral position. When removing the attachment, always disconnect the hydraulic couplings before unlocking the quick attach plate, to prevent hose damage and any oil spills. Reinstall the protective caps on the fittings to prevent impurities from entering the hydraulic system.
  • Page 10 10(16) Beware of the rotating mixing shaft of the mixer, which causes a hazard of entanglement. Keep a safe distance to the mixer when it is in operation. Never reach into the rotating mixer with any means. Also, never leave the mixer running unintended.
  • Page 11: Inspections, Maintenance And Servicing

    Finding any of these faults means that the hydraulic hose or component in question must be replaced. Spare parts are available from your nearest AVANT retailer or service point. Leave the service for professional maintenance, if unsure how to perform the repair safely.
  • Page 12: Lubricating The Mixing Bucket

    12(16) 7.2. Lubricating the mixing bucket The bucket has two lubrication points, to which a small amount of lubricant is added every 5-10 hours of use. The lubrication points are located at the bearings at both ends of the mixing shaft. The lubricating point at the free end of the axle is directly accessible.
  • Page 13: Warranty Terms

    13(16) 8. Warranty terms Avant Tecno Oy grants a warranty of one year (12 months) for the attachment from the date of purchase. The warranty covers repair costs as follows: • Work costs are covered, if the repair is not performed at the factory.
  • Page 15 SFS-EN ISO 12100, SFS-EN 982, SFS-EN 12151 Kuvaus: Avant-kuormainten kanssa käytettävä betoninsekoituslaite Beskrivning: Betongblandare: arbetsredskap för Avant lastare Description: Concrete mixer; attachment for Avant loaders Beschreibung: Betonmischer; Anbaugerät für Avant Radlader Mallit / Modeller / Models / Modellen: Avant Betonikauha, 270 l...

Table of Contents