braude TANKMASTER MP Installation, Operation And Maintenance Instructions

Combined temperature and liquid level controller

Advertisement

Quick Links

IN037 Rev 6 May 2019
Combined Temperature and Liquid Level Controller
These instructions should be carefully read and understood by all operators
before installing and commissioning the equipment. Failure to comply with
instructions could invalidate the warranty. The TANKMASTER is
manufactured from high performance materials and should give trouble free
service provided it is installed, operated and maintained in accordance with
these instructions
LIBERTA HOUSE, SANDHURST, BERKS. ENGLAND GU47 8JR
01252 876123
www.braude.co.uk
Co Reg No:
TANKMASTER MP TYPE
INSTALLATION, OPERATION
AND MAINTENANCE
INSTRUCTIONS
Models Covered:
TKMP16
TKMP23
TKMP27
TKMP28
585474
T
HERMAL PROCESS EQUIPMENT SPECIALISTS
Fax 01252 875281
sales@ebraude.com
VAT: GB492649406

Advertisement

loading
Need help?

Need help?

Do you have a question about the TANKMASTER MP and is the answer not in the manual?

Questions and answers

Summary of Contents for braude TANKMASTER MP

  • Page 1 IN037 Rev 6 May 2019 HERMAL PROCESS EQUIPMENT SPECIALISTS TANKMASTER MP TYPE Combined Temperature and Liquid Level Controller INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS These instructions should be carefully read and understood by all operators before installing and commissioning the equipment. Failure to comply with instructions could invalidate the warranty.
  • Page 2 Page: 2 Date: 06/09/2019 HERMAL PROCESS EQUIPMENT SPECIALISTS Controller description The Tankmaster MP is a microprocessor controlled temperature & liquid sensing controller capable of controlling liquid and temperature parameters within a process. Control LED’s Calibration Pots Wall mounting A & B...
  • Page 3  Should the Tankmaster MP be ordered as a mains output voltage type the grey output lead (marked with a red warning label and fitted with a protective cap) becomes live once the mains supply lead is connected to 230/110VAC. Always connect output lead first.
  • Page 4 The other lead is the mains supply. See Fig.1 Power Supplies The Tankmaster MP is equipped with an auto sensing circuit designed to accept either 110 or 230 volt AC without the need for changing any internal parts.
  • Page 5 Page: 5 Date: 06/09/2019 HERMAL PROCESS EQUIPMENT SPECIALISTS Volt free relay Mains relay 4.4 Connections for a live relay controller Refer to wiring diagram Fig 3 on page 7 Black 1 – Heater contactor Live This is a live relay- the output lead connection B1/B2 is 110/240 volts Black 2 - Heater contactor Neutral Black 3 –...
  • Page 6 Page: 6 Date: 06/09/2019 HERMAL PROCESS EQUIPMENT SPECIALISTS The T2 LED located to the left of the small LED display, indicates when temperature probe T2 is showing in the small LED display. This light is NOT activated on standard Tankmaster controllers. The ‘DB’...
  • Page 7 Page: 7 Date: 06/09/2019 HERMAL PROCESS EQUIPMENT SPECIALISTS temperature probe T1 (standard) and point B for probe T2 should your Tankmaster be configured for a two probe system. To calibrate the controller insert a small flat ended screwdriver into the correct hole until it engages with the potentiometer slot below.
  • Page 8 Page: 8 Date: 06/09/2019 HERMAL PROCESS EQUIPMENT SPECIALISTS Fig .2 TEMPERATURE LEVEL HEATER PUMP Temp and Liquid level status Alarm Alarm     Temperature below set point Temperature above set point Liquid level low Liquid level high Table showing LED and heater / pump status. IN037 Rev 6 May 2019...
  • Page 9: Wiring Connection

    Page: 9 Date: 06/09/2019 HERMAL PROCESS EQUIPMENT SPECIALISTS Wiring connection Fig 3: Wiring diagram for Tankmaster connected to Polaris heater (Live relay) IN037 Rev 6 May 2019...
  • Page 10 Page: 10 Date: 06/09/2019 HERMAL PROCESS EQUIPMENT SPECIALISTS Fig 4: Wiring diagram for Tankmaster connected to Polaris heater (Volt free relay) Installation of Sensors Probe Mounting: Position the probes at a suitable point in the tank where they will not be damaged.
  • Page 11 Short circuit T/M probe Check connections in probe plug, secure if disconnected. Check probe and replace if there is a short or open circuit. Controller and probe can be returned to E. Braude (London) Ltd., for Calibration, Service and Repair.
  • Page 12: Installation

    Page: 12 Date: 06/09/2019 HERMAL PROCESS EQUIPMENT SPECIALISTS 10.2 Dual level control (using 3 wire levelmaster probe) 10.2.1 Level Setting  Cut the white sensor to the high level required.  Cut the red sensor to the low level require ...
  • Page 13 It is recommended that the probe assemblies are cleaned as part of the regular maintenance schedule to avoid build up of scale or other solids. E. BRAUDE (LONDON) LTD LIBERTA HOUSE, SANDHURST, BERKS. ENGLAND GU47 8JR 01252 876123 Fax 01252 875281 www.braude.co.uk...

This manual is also suitable for:

Tankmaster mp tkmp16