Page 2
The draining system should be filled up with at least 0,5 l of water (siphon must be always filled with water). Check if water reaches sewerage system. Installed heaters must be 0-3 slope angle (fig. S2). 0 - 3 ~100 mm ~100 mm www.salda.lt...
Page 4
These conditions are readily discernable when the equipment is returned to our factory for inspection. If the direct client determines that equipment is found to be faulty, or a breakdown occurred, he should inform the manufacturer within five working days and deliver the equipment to manufacturer. Delivery costs should be covered by customer. www.salda.lt...