Centeron SM Series Instruction Manual

Digital two channel monitor

Advertisement

Quick Links

Digital Two Channel Monitor

Instruction Manual

Model:
SM Series
Document 040084A0001
Revision # A
Dated 02/25/2003

Advertisement

Table of Contents
loading

Summary of Contents for Centeron SM Series

  • Page 1: Instruction Manual

    Digital Two Channel Monitor Instruction Manual Model: SM Series Document 040084A0001 Revision # A Dated 02/25/2003...
  • Page 2 ® Centeron Digital Two Channel Monitor Instruction Manual NOTICE The information contained in this document is current as of the date of publication but is subject to change without notice. Robertshaw makes no warranty, expressed or implied, with regard to this material, including but not limited to the implied warranties of merchantability and fitness for a particular purpose.
  • Page 3: Table Of Contents

    ® Centeron Digital Two Channel Monitor Instruction Manual Table of Contents INTRODUCTION ....................1 PRODUCT OVERVIEW..................1 ....................... 1 ESCRIPTION 2.1.1 Product Markings..................1 ......................2 PERATION ..............3 NVIRONMENTAL PECIFICATIONS ....................3 ERTIFICATIONS 2.4.1 FCC Notice—Radio Frequency Communications........3 2.4.2...
  • Page 4: List Of Figures

    ® Centeron Digital Two Channel Monitor Instruction Manual List of Figures Figure 1: Monitor Label Product Markings ..............1 Figure 2: Example Completed Site Survey Form............... 7 Figure 3: Digital Two Channel Monitor Control Drawing..........A-1 Figure 4: Site Survey Form .................... B-1...
  • Page 5: Introduction

    ® Centeron Digital Two Channel Monitor Instruction Manual 1.0 Introduction This manual describes how to install, test, and service the Centeron Digital Two Channel ® ® Monitor. The Digital Two Channel Monitor is part of the Centeron Level Monitoring System that includes the High Level Alarm Console or a Controller used with a Data Collection System.
  • Page 6: Operation

    ® Centeron Digital Two Channel Monitor Instruction Manual 2.1.1.1 Product and Customer Identification Field This field is used to identify the product or customer depending on application. 2.1.1.2 Serial Number Field This field displays the seven character alphanumeric I.D. that uniquely identifies the Monitor (and tank) to the Receiver.
  • Page 7: Environmental Specifications

    Part 15 of Radiators and FCC Rules for Class B Computing Devices. CAUTION: Robertshaw Industrial Products Division does not support field changes or ® modifications to any of the Centeron Level Monitoring System equipment unless they are specifically covered in this manual. All adjustments must be made at the factory under the specific guidelines set forth in our manufacturing processes.
  • Page 8: Installation

    ® Centeron Digital Two Channel Monitor Instruction Manual 3.0 Installation A Quick Installation Guide, which provides an overview of the Digital Two Channel Monitor installation procedure, is included with this product. The following sections of this manual explain in detail the site selection and installation...
  • Page 9: Handling Guidelines

    ® Centeron Digital Two Channel Monitor Instruction Manual § Objects which are not electrically conductive such as wooden or fiberglass buildings, non-reinforced masonry, trees, plastic, and glass have less effect on radio signals than metal objects. § Windows and wooden doors can provide radio signals access into otherwise closed metal buildings.
  • Page 10: Activation

    ® Centeron Digital Two Channel Monitor Instruction Manual Install a thread-thread bushing in the bung to allow mounting of the Float Switch Assembly (if required). Step 3. Carefully insert the Float Switch Assembly into the tank and tighten it. Step 4.
  • Page 11: Troubleshooting And Testing

    Tank Contents (diesel fuel, etc.) § Description of Use (overfill protection, sump level monitoring, etc.) Figure 2: Example Completed Site Survey Form ® Robertshaw Centeron Level Monitoring System High Level Alarm Monitor Site Survey Form John Smith CONTACT NAME: Contact Address:...
  • Page 12 ® Centeron Digital Two Channel Monitor Instruction Manual Fault Condition Corrective Action Monitor never reported to the High Level Verify that this Monitor’s ID is properly Alarm Console stored in the High Level Alarm Console. Refer to the High Level Alarm Console’s Instruction Manual for details.
  • Page 13: Monitor Test

    ® Centeron Digital Two Channel Monitor Instruction Manual Fault Condition Corrective Action Monitor reports a low battery status Replace the battery by following Section 5.1 and repeat the above tests. If still having problems, refer to Section 5.5 for technical support.
  • Page 14: Servicing

    ® Centeron Digital Two Channel Monitor Instruction Manual watch for a response. Activate the Monitor by completely removing the magnet from the upper housing. § Verify that the Receiver received the RF data transmission by watching the light blink green (“test” light on Controller, appropriate Tank Status LED on Console).
  • Page 15: Warranty

    ® Centeron Digital Two Channel Monitor Instruction Manual § Insert the new battery (observing polarity markings molded into the battery holder). § Carefully install a new tie wrap through the circuit board slots and secure it around the battery. Trim the tie wrap, leaving a minimum of ¼” untrimmed material.
  • Page 16: Unit Disposal

    ® Centeron Digital Two Channel Monitor Instruction Manual purchase price applicable to the defective material or material not meeting specifications. Seller shall not be liable for any consequential damages nor any loss, damages or expenses directly or indirectly arising from the use of the material.
  • Page 17: Appendix A: Product Drawings

    ® Centeron Digital Two Channel Monitor Instruction Manual Appendix A: Product Drawings Figure 3: Digital Two Channel Monitor Control Drawing Robertshaw Industrial Products Page A-1...
  • Page 18: Appendix B: Site Survey Form

    ® Centeron Digital Two Channel Monitor Instruction Manual Appendix B: Site Survey Form Figure 4: Site Survey Form ® Robertshaw Centeron Level Monitoring System Digital Two Channel Monitor Site Survey Form Contact Name: Contact Address: Contact Telephone Number: GPS Location...
  • Page 19 U.S.A. – Robertshaw Industrial Products Division, 1602 Mustang Drive, Maryville, Tennessee 37801 865-981-3100 • Fax: 865-981-3168 www.Centeron.net The product described within contains RF technology licensed through Axonn Corp. under the following patents: 5,067,136 5,095,493 5,457,713...

Table of Contents