molex RFR-00082 Installation Instructions

1u 24 port configurable fiber sliding drawer

Advertisement

RFR-00082 – 1U 24 PORT CONFIGURABLE FIBER SLIDING DRAWER
DIRECTION BELOW APPLY SPECIFICALLY TO THE ENCLOSURE
Installing adjustable mounting angles (Fig.1)
The mounting brackets can be installed in one of two positions which effects Depth of the
enclosure is installed in the rack or cabinet.
Use M4 Philips pan head screws to attach mounting brackets to the enclosure.
Open/close slide drawer (Fig.2)
Release the plunger from grommet.
Use even pressure on both the right and left side to pull and push the drawer.
Slide drawer out to its point of full extension.
EC/ECM NO: 108434
SAP EC NO: 10794823
MPN/FMT-042 (2016/07/01 REV-00).
THIS INFORMATION IS CORRECT AS AT THE TIME OF PUBLICATION, SPECIFICATION ARE SUBJECT TO CHANGE
INSTALLATION INSTRUCTIONS
SAP NO : 187000366
http://www.molexpn.com/
BEFORE INSTALLING OR ADJUSTING THIS PRODUCT,
PLEASE READ THESE INSTRUCTIONS CAREFULLY.
PLEASE KEEP THIS GUIDE FOR FUTURE REFERENCE
Fig.1
Doc No: AS-18700-101 Doc part: AS
REV- A1
DATE: 2016/SEP/27
SHEET No. 1 of 4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RFR-00082 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for molex RFR-00082

  • Page 1 BEFORE INSTALLING OR ADJUSTING THIS PRODUCT, INSTALLATION INSTRUCTIONS PLEASE READ THESE INSTRUCTIONS CAREFULLY. PLEASE KEEP THIS GUIDE FOR FUTURE REFERENCE RFR-00082 – 1U 24 PORT CONFIGURABLE FIBER SLIDING DRAWER DIRECTION BELOW APPLY SPECIFICALLY TO THE ENCLOSURE Installing adjustable mounting angles (Fig.1) ...
  • Page 2 OPEN CLOSE Fig.2 Installation of Slack Management Spools (Fig. 3)  Spools are secured using kep nuts  Note: Do not install slack management Spools for Mod link MTP cable and Modular Splice Cassette installations. Fig.3 Back Cable Entry & Retention (Fig. 4) ...
  • Page 3  Full extension of the drawer is 1 feet.  Molex recommends a minimum of 1 meter of slack be stored inside the enclosure for tight buffered loose tube cables.  Provide minimum 5” to 6” of slack b/w the cable entry point and the point where the cable begins to spool around the slack management spools or Velcro straps.
  • Page 4 Installing Fiber Adapter Plates (Fig. 6)  Up to four Fiber adapter plates can be installed in the enclosure.  Adapter plates utilize corner retention push pins when pulled upon two corner fasteners.  Position the Fiber adapter plate in the appropriate location within the enclosure and push the two corner fasteners gently back until they will go no further.