5/8" ZP Hex Nut
Loctite Tube
Module Mounting Hardware ( x # of modules )
2" Stainless Steel J-Clip
1/4"-20 x 5/8" SS Hex Bolt
1/4"-20 x SS Hex Flange Lock Nut
1/4" SS Flat Washer
RECOMMENDED TOOLS:
• (2) 15/16" combination wrenches
• (2) 9/16" combination wrenches
• (2) ½" combination wrenches
NOTE TO INSTALLER: The installer
Track Rack™, use the list above to assure that you have all of your components. In the event that you may have
missing parts, contact Zomeworks Customer Service @ 1-800-279-6342. P
N
, S
N
UMBER
ERIAL
UTR-SERIES POLE INSTALLATION
IMPORTANT NOTE: ZOMEWORKS CORP. ASSUMES NO LIABILITY FOR THE STRUCTURAL
INTEGRITY OF THE POLE AND ITS INSTALLATION. SOIL AND WIND CONDITIONS VARY. IF THERE
IS ANY DOUBT, CONSULT WITH A LOCAL STRUCTURAL ENGINEER.
LOCATION CONSIDERATIONS:
For installations in sandy or muddy areas, for tall mounting poles, or for any mounting different from the
situations described in these instructions, you will need to consult a local structural engineer. Large T
R
™ can receive significant wind loads, so a strong mounting pole and foundation is very important. Also,
ACKS
be aware of turbulence near buildings or sudden changes in terrain. The site should receive the maximum
possible sunlight from AM to PM, in the winter and summer. Avoid shade from buildings and trees, including
shade that may occur in other seasons. The height of the pole should result in adequate ground clearance for the
mounted modules.
CAUTION – BE CAREFUL WORKING AROUND THE RACK AFTER INSTALLATION ON THE
POLE. SOME OF THE STRUCTURAL MEMBERS MAY BE AT HEAD LEVEL.
• The customer provided pole is a 2 1/2" (nominal) schedule 40 steel pipe with a 3" OD. Pole can be black or
galvanized steel pipe.
• Note: Heavier schedule steel pipe schedule 80, schedule 160 can be used as long as OD is 3".
• Using the chart below, find the MINIMUM acceptable pole height above your finished grade. It is strongly
recommended that the pole height be to our minimum specifications.
• The minimum recommended hole depth is 1/3 the pole length, 1/3 in the ground, 2/3 above the ground.
Example: 5' below grade, 10' above grade, total of a 15' pole.
• Center the pipe in the hole, and using a level, make sure pole is vertical.
• Fill the hole with concrete (3000-psi minimum strength), and check level of the pole.
, D
P
UMBER
ATE OF
URCHASE
1 ea.
1 ea.
Quantity Counterweight Bar & Counterweights ( #11 & 12 ) Quantity
4 ea.
5/8" ZP All Thread Bolt ( 17 1/4" long )
4 ea.
Rubber Hose ( 5 1/2" long )
4 ea.
5/8" ZP Hex Nut
4 ea.
5/8" ZP Flat Washer
5/8" ZP Lock Washer
5/8" ZP Jamb Nut
2 1/2lb Disk Weight
• (2) ¾" socket or combination wrenches
• (1) flathead screwdriver
• (1) 7/16" socket or combination wrench
provide the schedule 40 steel pipe. Before assembling your
MUST
, along with your D
5
have your S
LEASE
N
when calling.
EALER
AME
1 ea.
1 ea.
2 ea.
2 ea.
2 ea.
1 ea.
8 ea.
O
ALES
RDER
RACK
Need help?
Do you have a question about the UTR-020 TRACK RACK and is the answer not in the manual?