4
Scope of Delivery
Overview
8
7
6
5
Options
Connection type:
Standard version, Storz 75-B connection, PN16, with handle grip and
counter grip
6
Assembly
6.1 Installation Guidelines
•
Note flow direction
•
Use both handles when assembling on hydrant /
standpipe
•
Ensure that parts are free of dirt
•
Store in a clean and dry place
•
These armatures need to be maintained regularly
6.2 Assembly instructions
1.
Thoroughly flush hydrant / standpipe
2.
Check that backflow preventer connections are clean
3.
Assemble backflow preventer
Position backflow preventer and, using both handles, rotate it
and the counter coupling on the hydrant/standpipe to connect
Note flow direction (indicated by arrow)
Honeywell GmbH
5
4
3
GB
Components
1 Carry handle
2 Storz coupling
1
3 Dirt and fall protection
4 Piston (inside)
Seals (inside)
5 Housing
6 Stone trap
7 Counter grip
2
8 Rotatable Storz coupling
7
Maintenance
7.1 Inspection
The backflow preventer must undergo regular visual
inspections every 3 months at the latest. The following must
be checked:
•
State of the coupling
•
Dirt accumulation
–
Stone trap
–
Dust and fall protection
–
Drainage holes
–
Interior workings
If dirt has accumulated, clean with clear water without the
addition of detergents.
If any parts are damaged carry out a maintenance.
4
Materials
Aluminium
Aluminium
NBR
Aluminium
EPDM
Aluminium
Stainless steel
Aluminium
Aluminium
BFW112-65A
•
MU0H-1264 GE23 R0818