Piping Installation Glycol Charge ...7 March 2000 Installation and Table of Contents Mixing Glycol and Water Glycol Sludge Prevention Fluid Circulating Pump...8 Start-up Space and Location Requirements ...9-10 Typical Piping In-Warranty Return Material Procedure...11 Replacement Parts ... 12 Part No. 25001301...
Inspection Responsibility should be assigned to a dependable individual at the job site to receive material. Each shipment should be carefully checked against the bill of lading. The shipping receipt should not be signed until all items listed on the bill of lading have been accounted for. Check carefully for concealed damage.
Figure 1. Rigging Instructions. Vertical airflow type units should be located no closer than the width of the unit from a wall or other obstruction. It two or more units are to be positioned in the same area, a similar distance should be maintained between adjacent units. Sufficient free area should be left around and below unit to avoid air restriction to coil.
Table 1. Fluid Cooler Internal Volume and Weight Fluid Number Cooler Fan Configuration Fans 1 x 2 1 x 2 1 x 2 1 x 3 1 x 3 1 x 4 1 x 4 1 x 5 1 x 5 1 x 6 2 x 2 2 x 2...
Page 5
Diagram 1. Typical Fluid Cooler Wiring Diagram Without Fan Cycle Controls. Single Row of Fans Double Row of Fans...
Page 6
Diagram 2. Typical Fluid Cooler Wiring Diagram With Standard Fan Cycle Controls. Single Row of Fans Double Row of Fans...
System Installation NOTE: All installation and maintenance are to be performed only by qualified personnel who are familiar with local codes and regulations, and experienced with this type of equipment. CAUTION: Sharp edges and coil surfaces are a potential injury hazard. Avoid contact with them. General 1.
Table 4. Percentage of Ethylene Glycol to be Added by Volume. Percent % 20% 30% 40% Minimum Outside Design Temperature °F Table 4 is intended to be used as a guide only. Proper precautions need to be taken to prevent freeze damage during low ambients. Consult glycol ven- dor recommendations for specific freeze protection for your location.
Start-up Prestart: Check for correct dry cooler fan rotation. This can be done by quickly jogging the fan contactor. Be sure that the fans run freely. The same check is recommended for pumps. Filling and Purging the System The system should be pressure tested before adding glycol. The system can be tested with air or water, however if the ambient temperature is at or below freezing the use of air is recommended.
Walls or Obstructions The unit should be located so that air may circulate freely and not be recirculated. For proper air flow and access all sides of the unit should be a minimum of “W” away from any wall or obstruction. It is preferred that this distance be increased whenever possible.
In-Warranty Return Material Procedure Material may not be returned except by permission of authorized factory service personnel of Sterling, Inc. in New Berlin, Wisconsin. A “Return Goods” tag will be sent to be included with the returned material. Enter the required information on the tag in order to expedite handling at our factories and prompt issuance of credits.