Douglas D-Pro Max Series Assembly Instructions And Owner's Manual

Adjustable basketball system

Advertisement

Quick Links

ADJUSTABLE BASKETBALL SYSTEM
ASSEMBLY INSTRUCTIONS AND OWNER'S MANUAL
D-Pro Max Series
!
WARNING
FAILURE TO COMPLY WITH ANY OF
THE WARNINGS IN THESE INSTRUCTIONS
MAY RESULT IN SERIOUS PERSONAL
INJURY.
FAILURE TO COMPLY MAY ALSO
RESULT IN PROPERTY DAMAGE.
PLEASE HEED ALL WARNINGS AND
CAUTIONS TO ENSURE YOUR SAFETY.
DO NOT ATTEMPT TO ASSEMBLE
THIS SYSTEM WITHOUT CAREFULLY
READING AND FOLLOWING ALL
INSTRUCTIONS. BEGIN BY IDENTIFYING
AND TAKING INVENTORY OF ALL PARTS
USING THE PARTS LIST PROVIDED.
Keep this instruction manual in case you have to contact the manufacturer for replacement parts.
!
Douglas Industries, Inc.
3441 South 11th Ave. -Eldridge, IA 52748
Telephone: 1-800-553-8907
www.douglas-sports.com
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the D-Pro Max Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Douglas D-Pro Max Series

  • Page 1 ADJUSTABLE BASKETBALL SYSTEM ASSEMBLY INSTRUCTIONS AND OWNER'S MANUAL D-Pro Max Series WARNING FAILURE TO COMPLY WITH ANY OF THE WARNINGS IN THESE INSTRUCTIONS MAY RESULT IN SERIOUS PERSONAL INJURY. FAILURE TO COMPLY MAY ALSO RESULT IN PROPERTY DAMAGE. PLEASE HEED ALL WARNINGS AND CAUTIONS TO ENSURE YOUR SAFETY.
  • Page 2: Before You Start

    TOOLS AND MATERIALS REQUIRED FOR ASSEMBLY (Not Included) 1. (2 ) Adjustable Wrenches 10. Shovel 2. Socket Set 11. Concrete-1/2 yard or 14-16 Bags, (80 lb. bags) 3. 3/4" Wrench 4. 5/8" Wrench 12. Phillips Head Screwdriver 5. 1" Wrench 13.
  • Page 3 Verify all parts listed on packing list are present prior to installation. Contact our Customer Service at 1-800-553-8907 for assistance with replacement of any parts missing or damaged. 13 10 16 13 16 13 4 13 3 PARTS LIST ITEM QTY DESCRIPTION Main Post Actuator Spring-Assist Cartridge...
  • Page 4 Utility Markings Color Definition Electric Yellow Gas, Oil, Petroleum Orange Communication, Phone, TV Blue Portable Water, Irrigation One, free easy call gets your utility lines marked Green/Brown Sewer AND helps protect you from injury and expense White Proposed Dig NOTE: At rim height 10’ , distance from the face of backboard to the front of Main Post(A) is 48”, Choose the proper location to dig for the concrete footing: STEP A...
  • Page 6 WARNING *BECAUSE OF THE SIZE AND WEIGHT OF THE SYSTEM, A MINIMUM OF THREE ADULTS ARE REQUIRED FOR THE FOLLOWING STEPS* STEP1 Slide a 16mm Thick Washer (U3) over each of the J-Bolts (U2) as shown in FIGURE 1A. Remove the Padding from Main Post (A). Place the Main Post (A) over the J-Bolts. Slide a 16mm Thick Washer (U3), a Lock washer 16mm (U6) and thread a 16mm Hex Nut (U4) to each J-bolt.
  • Page 7 STEP 3 Connect Actuator to Main Extension arm. Place the upper bracket of Actuator(B) between the last set of welded tubes on the Main Extension Arm (F), attach the two parts using Hex bolt M18 x 12.6” (#5), two Flat Washers M18 (#11), one Lock nut (#14). Connect Actuator(B) to the mounting bracket welded in the middle of Post (A), using one Hex Bolt M16 x 5.3”...
  • Page 8 STEP 6 Crank the Main extension arm as low as possible. Attach the Backboard to Main Extension Arm (F) by using two Hex Bolt M12 x 1.57” (#4), four M12 Flat Washers(#13), two Nylon washers (#3) and one Lock Nut M12 (#16).

Table of Contents