Inspection Checklist - SPX MARLEY CLASS 800 User Manual

Mechanical draft cooling tower
Table of Contents

Advertisement

Inspection Checklist

Date Inspected
Owner
Owner's Tower Designation
Tower Manufacturer
Process Served by Tower
Design Conditions
GPM
Number of Fan Cells
Condition: 1—Good
Structure
Casing Material
Structural Material
Fan Deck Material
Stairway?
Material
Ladder?
Material
Handrails?
Material
Interior Walkway?
Cold Water Basin Material
Water Distribution System
Distribution Basin Material
Inlet Pipe Material
Inlet Manifold Material
Flow Control Valves?
Nozzles — Orifice Diameter
Heat Transfer System
Fill
Drift Eliminators
Louvers
Use this space to list specific items needing attention:
26
Inspected By
Location
Model No.
Operation:
HW
2—Keep an eye on it
1 2 3
Material
Size
"
"
Continuous
Intermittent
°F
CW
°F
3—Needs immediate attention
Comments
Serial No.
Seasonal
WB
°F

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents