BOMCO F-1300 Instruction Manual

Mud pump
Hide thumbs Also See for F-1300:

Advertisement

BOMCO F-1300/1600 Mud Pump
Instruction Manual
AH13010200SM
AH16010200SM
June, 2007

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the F-1300 and is the answer not in the manual?

Questions and answers

Summary of Contents for BOMCO F-1300

  • Page 1 BOMCO F-1300/1600 Mud Pump Instruction Manual AH13010200SM AH16010200SM June, 2007...
  • Page 2: Table Of Contents

    EXPLAINS FOR ORDER ......................... 43 7.1 P ROVIDED RANGE OF MUD PUMP ........................43 7.2 M ETRIC SYSTEM AND RITISH SYSTEM ......................43 7.3 D RIVE ROTATION DIRECTION ......................... 43 LUBE APPLICATION GUIDE..................43 F-1300/1600 MUD PUMP PARTS CONTENT..............44...
  • Page 3 Thanks for using F series mud pumps produced by Baoji Oilfield Machinery Co., Ltd. The outline dimension, frame, and fluid end of F-1300 and 1600 mud pump are the same, only the bearing and gear pair of power end are different. For convenience of customer, this manual introduces these two kinds mud pumps at the same time.
  • Page 4: Use Of New Mud Pump

    BOMCO F-1300/1600 is key equipment matched to drilling rig for petroleum well. It is used for transporting drilling fluid to well bottom by high-pressure manifolds of circulating system in order to cool off the drill bit, flush the well bottom, crush and take out the rock, and balance the formation pressure.
  • Page 5 (3.206) Note: 1. Based on 100% volumetric efficiency and 90% mechanical efficiency. Recommended strokes and input power for continuous service. Table 1B Performance data of F-1300/1600 Mud Pump Liner Diameter, in & Rating pressure, MPa(Psi) 6 3/4 6 1/2 6 1/4...
  • Page 6: Installation Of New Pump

    MUST BE IN THE SAFE POSITION. The skid under the F-1300/1600 mud pumps is suitable for any type of installation. However, the support under the pump must be level and adequate to support the self-weight and operating forces...
  • Page 7 Fig. 2 1.2.1. Ground Installation When ground installation is going on, 8 pieces of 76mm×305mm boards is cushioned in the direction of pump skid, as indicated in Fig.2. The base of boards should be 300mm wider than that of pump skid beam.
  • Page 8 Fig. 3 1.2.3. Installations of Driving Device The drive between the mud pumps and prime mover should be adopted V-belts or multi-row chains drive, which is installed with precision to assure longest service life and minimum possibility of unexpected or undesirable shutdowns due to drive failures. When installing the drive sheave or sprocket, make sure all grease or rust preventative is removed clearly from the shaft end and the matched bore.
  • Page 9: Requirements For Suction System

    Fill chain case to the indicated level with lube grease. Lubricant brand can refer to “Lubrication oil guide of BOMCO products”. If temperature is below 0ºF, consult department of lube grease supplier for recommendations.
  • Page 10: The Preparation Of Power End

    1450-rpm electric motor). The centrifugal pump should be started or stopped automatically and simultaneously with the drilling pump. On DC electric drilling rig, generally a sign got from DC control disc excites magnetic starter. Centrifugal pump also can be driven by belt and the force comes from pinion shaft of pump. When arranging suction lines, charging pump is adopted by-passed connection, so operation can be continued even if pump is failed or repaired.
  • Page 11: Spray Pump Assembly

    ⑴stuffing box (2) Bolt (3) Shim (4) O ring (5) spring (6) two-lip oil seal (7) Sealing ring (8) O ring (9) Locking spring (10) Bolt (11) Bolt (12) O-ring Refer to Figure 4, remove the stuffing box○ 1 and mud apron so that crosshead is at the front of the stroke;...
  • Page 12 Stationary spray pipes have been used on F-series pumps Ref. Fig 5. It consists of a fixture frame (1), steel pipe (2) and spray nozzle (3), it makes cooling fluid spray to piston and liner. Adjust cooling water supply to the manifold and inspect spray nozzle operation very often to make sure the nozzle is pointed directly at the piston.
  • Page 13: The Assembly Of Fluid End Parts

    ⑴Oil level indicator (2) Plug (3) Spray pump (4) Regulating valve (5) Water tank 1.6. The assembly of Fluid End Parts A profile of the fluid end for F-1300/1600 is shown in Fig, 8. Refer to Fig. 8, clean and assemble the...
  • Page 14: Fluid End Assembly

    Instruction Manual for F1300/1600 Mud Pump fluid end parts as following: Note: Most of the parts in fluid end are designed with metal to metal seating to alleviate friction wear from breathing action encountered in modern high pressure pump operation. For this reason it is essential that all parts should be clean and free of rust, nicks and burrs to ensure reliable seal before being assembled.
  • Page 15 Instruction Manual for F1300/1600 Mud Pump 1.6.2. Liners Installs wear-resisting plate seal (1) in counter bore of fluid end (see Fig. 8). Install wear-resisting plate (2) through studs until it seats against fluid end. Mount liner flange (3) over studs with the starting thread at the 5 o’clock position and tighten bolts with 640~690N.m (470~510ft.lbs) torque.
  • Page 16 Instruction Manual for F1300/1600 Mud Pump 1.6.6. Valve Cover Install valve cover seal ring (18) into bore, and after grease the valve cover seal area and threads area, tighten the valve covers into place using a sledge hammer and bar. 1.6.7 Discharge Manifold API 5"...
  • Page 17: Dampener Assembly

    Instruction Manual for F1300/1600 Mud Pump relief valve and the manifold. Pipe the discharge end of the relief valve directly into the mud pit with seamless steel pipe as few turns in the line as possible. If the turn must be made, the elbow should be over120º.
  • Page 18 Instruction Manual for F1300/1600 Mud Pump shield ○ 8 is used for lifting dampener assembly. Before assembly thoroughly clean ring groove, gasket ring ○ 1 and groove of mating flange and coat with grease. Lifting the dampener to the corresponding position of mud pump discharge line, screw nut (R4) with 950~1265N.m (700~935ft.lbs) torque.
  • Page 19: Shear Safety Valve

    The type of pressure system provided in each individual pump will govern the minimum stroke at which the pump can be operated. The pressure lubricating system of F-1300/1600 mud pump is shown in Fig.13, which can be operated at 25 strokes/minute (oil pressure is 0.035 Mpa;...
  • Page 20: Controlled Flow Splash System

    Instruction Manual for F1300/1600 Mud Pump 小齿圈 大齿圈 油泵齿轮 Fig. 13 NOTE: The pressure lubricating oil pump can be mounted on the external of drilling pump and driven by V-belt; or install the oil pump in the drilling pump driven by the gear ring. When an internally mounted oil pump is used, the direction of pinion shaft rotation should be as shown in Fig.
  • Page 21: Pressure Lubrication System

    Instruction Manual for F1300/1600 Mud Pump Fig. 14 (1) Nipple (2) retainer (3) bolt (4) crosshead pin (5) oil passage 2.3 Pressure Lubrication System The pressure lubrication system, incorporating the oil pump for the F-series pumps, is shown in Figure 15: In this system, filtered oil is supplied to the pump through the suction filter (1) and is discharged from the pump into the manifold block (2) and nozzle (3A).
  • Page 22 Instruction Manual for F1300/1600 Mud Pump Fig.15 (1) Filter (2) Oil distributor (3) Oil line (3A) Spray nozzle (4) Main bearing oil line (4A) Oil distributor (5)Pressure gauge (6) Relief valve (7) Oil trough (8) Oil tube (9) Lubrication pump A pressure relief valve (6) is mounted to the oil distributor (2) to prevent excess pressure from damaging oil pump and drive.
  • Page 23: Maintenance Of Lubrication System

    – free service life that will be obtained. 2.4.1 Lubrication specifications: The lubricant refers to the nameplate on the side of the pump or “BOMCO Products Lubricant Use Guide”. These lubricants are the result of extensive long-term field tests and can validate to wear away (include gear, bearing and guild cross head).
  • Page 24: Maintenance

    Instruction Manual for F1300/1600 Mud Pump Sludge should be drained out of the pump in setting chamber located on the frame wall underneath the crosshead inspection doors. Check once each month; remove clean out covers on both sides of pump to drain oil with sludge from setting chamber.
  • Page 25: Roller Bearings

    Instruction Manual for F1300/1600 Mud Pump 3.1.5 Main bearing cover Remove the main bearing cover and check tightness of main bearing retainer blots, condition of the bearing rollers, etc. Clean and remove any sludge or foreign substance that might have accumulated at the bottom of the bearing area.
  • Page 26: Pinion Shaft Assembly

    Instruction Manual for F1300/1600 Mud Pump Do not heat the bearings with a torch unless it is the only possible means available. When it is necessary to use a torch, it should be used only by an experienced welder or mechanic. Hold the torch at least 150mm (6 inches) away from the bearing and keep the torch moving at all times.
  • Page 27: Crankshaft Assembly

    Instruction Manual for F1300/1600 Mud Pump When installing the pinion shaft assembly on the pump, observe the following precautions: Insure pinion bearing carrier gasket (1) and oil seal carrier gasket (2) are in place and in good condition. When installing the bearing sleeve (3) and the cover (4), make oil collecting groove face to (7) and correctly align with oil return bore.
  • Page 28 Instruction Manual for F1300/1600 Mud Pump Fig.18 (1) Cover (2) Bolt (3) Retainer ring (4) Bolt (5) Bearing retainer ring (7) Retainer ring (8) Bolt (8A) Inner hex bolts (9) Main bearing (10) Right bearing sleeve (11) Left bearing sleeve (12) Outer retainer ring (13) Connecting rod bearing (14) Inner retainer ring (15) Bolt (16) Main bearing retainer (17) Inner race retainer (18) Bolt (19) Crosshead bearing 1) Install gear ring and check run-out.
  • Page 29: Installing Crankshaft Assembly In The Frame

    Instruction Manual for F1300/1600 Mud Pump should not be intermixed. 4) Install the inner race of the crosshead bearing on the crosshead pin and mark respective items (like 1,2,3 or left/mid/right) according to their positions. Remove all nicks and burrs before shrinking race into place.
  • Page 30: Installing Of Crosshead Guides

    2) If old guides are to be reused, inspect the friction surfaces for wear and scoring streaks. Otherwise it should be replaced. NOTE: For F-1300/F-1600 upper and lower crosshead guides are NOT interchangeable. The lower guide places the crosshead on frame centerline, and upper guides are machined to afford proper clearance between crosshead and upper guide.
  • Page 31: Installing Of Crosshead

    Instruction Manual for F1300/1600 Mud Pump 3.7 Installing of Crosshead The crossheads in the pumps can be installed through the front (fluid end) or back end of the crosshead guide. Refer to Fig.20, when installing crossheads, and observe the following precautions: Fig.20 1) Thoroughly clean all dirt or contamination and remove all burrs or rough edges from OD of the crosshead, crosshead pin bores, and inner bore of crosshead guide.
  • Page 32: Checking Crosshead Alignment

    Instruction Manual for F1300/1600 Mud Pump Fig.21 (1) Mud guard (2) Crosshead pin retainer (3) Bolt (4) Bolt (5) Jack screw bore (6) Lower guide (7) Frame (8) Dirt discharge bore (9) Pipe plug (10) Oil accumulating box (11) Upper guide (12) Air shield (14) Oil level gauge Strike gently the crosshead large end into cone bore, fasten retainer bolt (3) and (4) (see Fig.21) with torque 225~240 N.m (165~175ft.
  • Page 33: Fluid End Maintenance

    Instruction Manual for F1300/1600 Mud Pump 3) Rotate pump to extreme rear of stroke and take measurement again at the same place. Compare these measurements to the ones taken at the front of the stroke to determine if crosshead is running horizontally.
  • Page 34: Fluid Cylinder

    Instruction Manual for F1300/1600 Mud Pump The fluid end assembly for these triplex pumps consists of three forged cylinder, complete with liner, valve pot covers and cylinder heads, a suction manifold, and a discharge manifold. 3.9.1 Fluid Cylinder See Fig.22 for the structure of cylinder and dimension data in table 5. The three separate fluid cylinders (1) connect metal –to-metal with the power end frame through retainer studs (2);...
  • Page 35: Suction Manifold

    Fig.22 (1) Cylinder (2) Bolt (3) Suction pipe (4) O ring (5) Bolt (6) Discharge pipe (7) O ring (8) Bolt (9) Cylinder head flange (10) Bolt 3.9.2 Suction Manifold The suction manifold (3) bolts to each cylinder block and seal the flange connection face through the 0-ring.
  • Page 36: Cylinder Head Flange

    Instruction Manual for F1300/1600 Mud Pump 3.9.4 Cylinder Head flange A replaceable cylinder head flange (9) is screwed on the face of the cylinder blocks. The flange must make up metal-to-metal with face of cylinder blocks in order for the axis vertical of the end face and cylinder.
  • Page 37: Repair Valve Cover Bore

    Instruction Manual for F1300/1600 Mud Pump The purpose of preheating is to expand the area being repaired so that as the cooling process takes place, the welded area and the preheated area will cool more uniformly. Heat cracking during eliminating weld also prevents hard spots from forming between the base metal and the welding by eliminating a thermal shock as the weld is being applied.
  • Page 38: Approximate Weights Of F-1300/1600 Pump Assemblies

    Seat neck seal of bladder on shell port; meantime coat grease on neck inside. 7) Assembly the cover (Item 5). 8) Tighten nuts (Item R2) with the torque 1625-2170N.m (1200-1600ft.lbs). 9) Charge following Item1.7.2. 3.13 Approximate Weights of F-1300/1600 Pump Assemblies Fluid NAME Pinion Crank...
  • Page 39: Weekly Maintenance

    Instruction Manual for F1300/1600 Mud Pump 9) Loose piston bar clamp every day and check if clamp conical face, piston bar and mid tension bar connecting face are clean, then rotate the piston bar a quarter of one circle to tighten, which makes the wear face of piston bar evenly distributed and prolongs the service life of piston and liner.
  • Page 40: Matters Need Attention In Maintenance

    Instruction Manual for F1300/1600 Mud Pump 4.5 Matters need attention in Maintenance 1) Before tightening the mid extension rod and piston rod, the matched taper face should be cleaned. 2) When changing the liner, the liner seal ring should be changed as well. 3) In winter after stopping the pump, the mud in the valve compartment and liner should be discharged and cleaned completely.
  • Page 41 Instruction Manual for F1300/1600 Mud Pump valve spring, change the damaged one. Check if the locknuts of piston are corrosive or damaged. Change if they are Weekly damaged (normally, change after using three times). Weekly Check the filter screen of lubricating system. Clean it if it is plugged. Weekly Loosen the plug of drain flange, discharge the dirt and water in the oil pool.
  • Page 42: Troubleshooting

    Instruction Manual for F1300/1600 Mud Pump Fig.24 Maintenance checkpoints Note: Daily Maintenance: 1-12 Weekly Maintenance: 13-18 Monthly Maintenance: 19-22 Yearly Maintenance: 23-28 Troubleshooting During the running of the pump, if there are troubles, the reason should be found and the trouble should be solved in time, otherwise, they will affect the normal working of the pump.
  • Page 43 Instruction Manual for F1300/1600 Mud Pump become sealed off and the air gets charging piping or change the discharge reduces or no mud into the pump. gasket. discharged. 2. The suction filter screen is 2. Stop the pump and clean the plugged.
  • Page 44: Matters Need Attention For Storage

    Instruction Manual for F1300/1600 Mud Pump reasons should be found according to the trouble spot. After troubleshooting, the pump can run normally. Matters need attention for storage 1) When the pumps are not used for a long time, they should be stored. 2) Before storing, clean it carefully, empty each part of fluid end and clean it with water.
  • Page 45: F-1300/1600 Mud Pump Parts Content

    Grease SHC shaft ~ lithium base grease Cardan shaft) * IADC(International Association of Drilling Contractor)recommend to use. 9. F-1300/1600 Mud Pump Parts Content Parts Content Drawing List Drawing description Drawing No. or Part No. F-1300/1600 General Assembly AH13010200 / AH16010200...
  • Page 46 Instruction Manual for F1300/1600 Mud Pump F-1300/1600 Spare Parts List F-1300/1600 Tool List F-1300/1600 Mud Pump General Assembly 11 43 54 6 56 17 8 36 B向...
  • Page 47 Instruction Manual for F1300/1600 Mud Pump F-1300/1600 Drilling Mud Pump Drawing No. Item Description F-1300 F-1600 Frame assembly AH1301020100 AH1301020100 Crank shaft assembly AH1301020200 AH1601020100 Pinion shaft assembly AH1301020300 AH1601020200 Crosshead assembly AH1301020400 AH1301020400 Fluid end assembly AH1301020500 AH1301020500 Power...
  • Page 48 Instruction Manual for F1300/1600 Mud Pump Drawing No. Item Description F-1300 F-1600 Flange T508-1002 T508-1002 KB-75 Dampener AK75350200 AK75350200 JA-3 Shear relieve valve AH0000060200 AH0000060200 Connection tube T510-1002 T510-1002 Cover plate AH1301011800 AH1301011800 Right-angle joint T511-1002 T511-1002 Bolt 1/2-13UNCX1 T500-1001...
  • Page 49 Instruction Manual for F1300/1600 Mud Pump Crankshaft Assembly Fluid End 13 14 Drawing No. Item Description F-1300 F-1600 Main bearing AH130101020100 AH130101020100 cover Bearing sleeve, AH1301010202 AH1601020101 right Gasket AH1301010203 AH1301010203 Inner race AH1301010204 AH1301010204 retainer Outer race AH130101020500 AH160101010200...
  • Page 50 Instruction Manual for F1300/1600 Mud Pump Drawing No. Item Description F-1300 F-1600 AH130101020100 AH130101020100 Locating ring (I) AH1301020201 AH1601020101 Hollow crankshaft AH1301010203 AH1301010203 Locating ring (II) AH1301010204 AH1301010204 Gear ring AH130101020500 AH160101010200 Piston 1/2-8UN Bolt 1 1/2-8UNx5 AH1301020202 AH1601020102 AH1301020203...
  • Page 51 Instruction Manual for F1300/1600 Mud Pump Drawing No. Item Description F-1300 F-1600 AH1301010218 AH1601010108 Gear ring (split one) 420501036160200000 420501036160200000 Bolt 1 1/2-8UN× F-1300/1600 Pinion Shaft Assembly 11 16 Fluid End Drawing No. Item Description F-1300 F-1600 AH1301020301 AH1301020301 Key 2″×2″×11 3/8″ AH1301020302 AH1601020201...
  • Page 52 Instruction Manual for F1300/1600 Mud Pump Drawing No. Item Description F-1300 F-1600 T500-1027 T500-1027 Bolt 7/8-9UNCX2 AH1301010311 AH1301010311 seal 9.125"X10.375"X0.625" AH1301010312 AH1301010312 Bearing 4G32844H 420503011221600000 420503011221600000 Spring washer 22 (GB93) 420503011141600000 420503011141600000 Spring washer 14 (GB93) AH1301010313 AH1301010313 Flange T500-2003...
  • Page 53 Instruction Manual for F1300/1600 Mud Pump F-1300/1600 Crosshead Assembly 30 20 Link 2426 Item No. Qty. Description Drawing No. Crosshead AH1301020401 Crosshead guide (upper) AH1301010402 Shim set AH100101041700 Shim AH1301010403 Stuffing box AH1301010404 Sealing ring AH1301010405 O-ring φ190×3.55 (GB3452.1) 530301011900035507...
  • Page 54 Instruction Manual for F1300/1600 Mud Pump Item No. Qty. Description Drawing No. Double lip seal 5"X6.25"X0.625" AH1301010406 Locking spring AH1301010407 Mud guard plate AH1301010408 Crosshead extension rod AH1301010409 Crosshead pin AH1301020403 O-ring φ125×7 (GB3452.1) 530301011250070007 Bolt 3/4-10UNCX2 1/2 T500-3010 Plate gasket AH1301010411 O-ring φ160×7 (GB3452.1) 530301011600070007...
  • Page 55 Instruction Manual for F1300/1600 Mud Pump F-1300/1600 Fluid End Assembly 4914 53 56 41...
  • Page 56 Item Qty. Description Drawing No. AH130102050100 Fluid end Assembly AH1301010502 Cylinder head flange AH1301010503 Cylinder head AH130101050400 Plug assembly AH130101050500 Valve rod guide (lower) AH130101050600 Cylinder head plug AH1301010507 Locating plate AH1301010508 Cylinder head seal ring AH1301010509 Discharge manifold AH00000101 Valve spring 530301010950053007 O-ring φ95×5.3 (GB3452.1)
  • Page 57 Instruction Manual for F1300/1600 Mud Pump Item Qty. Description Drawing No. AH130101052300 Shim set AH1001010527 Gasket 39 AH1001010510 Valve rod guide T500-7002 Stud bolt 1 1/2-8UNCX10 1/2 T501-2001 Nut 1 1/2-8UN AH1001010512 Retainer AH0501020509 Bolt 3/8-16UNCX3/4 530301010412035507 O-ring 41.2x3.55 (GB3452.1) T501-303.0 Piston nut 1 1/2-8UN 530301011850070007...
  • Page 58 F-1300/1600 Power End Lubrication Assembly 1920 7 23 41 15 10 8 3934 (乐泰609)
  • Page 59 Instruction Manual for F1300/1600 Mud Pump Item Description Drawing No. Key 3/16×3/16×1 T516-2001 Oil pump gear assembly AH080102060100 90° elbow NPT1/4×NPT 3/8 T001-2204 Bolt A12(GB5650) 520902540320120100 Inner hexagon screw 5/16-18UNCX1 T500-3003 Connector A16 (JB/ZQ4410) 520901010350040040 Connector A8 (JB/ZQ4410) 520901010350050050 90° elbow NPT1/4×NPT1/4 T001-2203 Copper tube 051102010080010002...
  • Page 60 Instruction Manual for F1300/1600 Mud Pump Item Description Drawing No. Washer A12 (GB5651) 520902551280120100 Bolt 1/4-20UNCX3/4 T500-1007 Oil jet AH1301010601 Copper tube Φ12×610 (GB1527) 051102010012010002 Copper tube Φ8×813 (GB1527) 051102010080010002 Connector A8 (GB5628.1) 520901010050050050 Pipe clamp-double Φ8 AH050102060200 051102010010010002 Copper tube Φ10×1956 (GB1527)...
  • Page 61 F-1300/1600 Spray pump assembly Center line of Pump 2021 Item Description Drawing No.
  • Page 62 Instruction Manual for F1300/1600 Mud Pump AH130102080100 Guard AH130102080300 Sheave AH1301010802 Support Assembly AH100102080200 Connector Z1″-G1″ AH1001010804 Connector Z1″ AH1001010805 Connector G1″-M33×2 AH1001010806 Connector ZG2-1/2″ AH1001010807 Connector ZG2 1/2″-Z2 1/2 AH1001010808 Hose Φ22×Φ37 140501010220100000 Hose connector Φ22×Φ37 AH100101080900 Elbow 90° Z1" AH1001010810 Connection plate AH1001020803...
  • Page 63 Instruction Manual for F1300/1600 Mud Pump F-1300/1600 Suction Dampener Item No. Description Drawing No. Suction dampener assembly AH0000050100 Bladder AH0000050101 Cover AH0000050102...
  • Page 64 Instruction Manual for F1300/1600 Mud Pump F-1300/1600 Discharge Strainer Assembly Item Description Part No. O-ring φ165×7 530301011650070007 Strainer Assembly AH100101190200 Housing AH1001011901 Stud M39×2-M39×3×135 T503-4007 Nut M39×3 T507-2011 Flange 5 1/8×35MPa T508-1002 Gasket ring R44 T508-5002 Discharge cross joint AH100101200300...
  • Page 65 KB-75 Pulsation Dampener Item Description Drawing No. General drawing AK75350200 Gasket ring R39 T508-5001 Bottom plug AK75350101 Bladder AK7535010200 Housing assembly AK7535020100 Cover AK75350202 Tee joint NPT 1/4″ T511-2001 Joint NPT 1/4″ AK75350106 Pressure gauge guard assembly AK7535020300 Air discharge valve AK7535010001 Pressure gauge 0-25MPa NPT1/4 380202052250006020...
  • Page 66 Instruction Manual for F1300/1600 Mud Pump Gasket T514-1001 Stud bolt 1 1/2X4 3/4 T500-6002 Nut 1 1/2-8UN T501-2001 Stud nut 1 1/4X4 1/4 T500-6003 Nut 1 1/4-8UN T500-2002 Pulsation Dampener Charging Hose Assembly Item Description Drawing No. Pulsation dampener charging AH100102130100 hose assembly Nut G5/8″...
  • Page 67 JA-3 Shear Relief Valve A - A 19 20 Item No. Description Part No. JA-3 Shear relief valve AH0000060200 Joint AH0000060101 Retainer ring AH0000060102 Plunger assembly AH000006010300 Valve body AH0000060104 Plunger stem AH0000060105 Bumper AH0000060106 Roll pin AH0000060107 Locking spring AH0000060108 Guard AH0000060109...
  • Page 68 Instruction Manual for F1300/1600 Mud Pump Screw M4×16 420101021104001600 Bolt T500-1016 3/8-16UNCX4 1/4 T501-1005 3/8-16UNC Screw M3×8 420101020703000800...
  • Page 69 F-1300/1600 Spare Parts List Item Description Drawing No. Spare parts AH1301021100 Oil seal 9.125″×10.375″×0.625″ AH1301010311 O-ring Φ190×3.55(GB3452.1) 530301011900035000 O-ring Φ160×7(GB3452.1) 530301011600070007 Double lip oil seal 5″×6.25″×0.625″ AH1301010406 O-ring Φ95×5.3 (GB3452.1) 530301010950053007 Valve cover seal ring AH1301010510 Liner seal AH1301010512 Cylinder head seal AH1301010508 O-ring Φ200×7 (GB3452.1)...
  • Page 70 Instruction Manual for F1300/1600 Mud Pump F-1300/1600 Tool List Item No. Description Drawing No. Attachment tools AH1301021000 Liner lifting tool AH130102100100 Cylinder head rod AH100101210100 Sleeve 2 3/8″ AH1001012108 Sleeve 2″ AH1001012109 Sleeve 3 5/8″ AH1301011602 Sleeve 1 1/2″ AH1301011603...

This manual is also suitable for:

F-1600

Table of Contents

Save PDF