Notes for the planning engineer

4.1

Selecting the unit version

4.1.1

Determination of the required steam capacity

18
To select the unit version the following planning steps are required:
1. Determinating the required maximum steam capacity according chap­
ter 4.1.1
2. Selecting the unit version from the table in chapter 4.1.2
The steam capacity required for a particular steam bath can be determined
with the following table:
Cabin size
4 m
3
8 m
3
12 m
3
16 m
3
20 m
3
24 m
3
28 m
3
32 m
3
36 m
3
40 m
3
44 m
3
48 m
3
52 m
3
56 m
3
60 m
3
Important notes:
The determined steam capacity based on the above table does not
consider any steam loss (e.g. due to condensation in the steam hoses
and the steam distributors), any heat loss of the unit as well as any
absorption or release of humidity of materials located in the steam bath
being humidi fied.
In addition, the calculated steam capacity does not consider any losses
caused by the draining rate depending on the water quality as well as
any losses occur if the steam generator is operated on a mains circuit
with a ground fault circuit interrupter.
The total amount of losses depends on the entire system and must be
taken into consideration when determinating the required steam capac­
ity. If you have any questions regarding the calculation of the steam
capacity please contact your Nordmann supplier.
Required steam capacity
Plastic cabin
brick lined cabin
5 kg/h
8 kg/h
10 kg/h
12 kg/h
13 kg/h
15 kg/h
17 kg/h
18 kg/h
20 kg/h
21 kg/h
23 kg/h
24 kg/h
26 kg/h
27 kg/h
29 kg/h
8 kg/h
12 kg/h
15 kg/h
18 kg/h
21 kg/h
24 kg/h
26 kg/h
29 kg/h
31 kg/h
34 kg/h
36 kg/h
38 kg/h
41 kg/h
43 kg/h
45 kg/h