Advertisement

Innovation for clean Water
©
ATB-control
3
Installation instructions
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ATB-control 3 and is the answer not in the manual?

Questions and answers

Summary of Contents for ATB ATB-control 3

  • Page 1 Innovation for clean Water © ATB-control Installation instructions...
  • Page 2: General And Safety Information

    © Should the ATBcontrol 3 be used for other purposes without the express approval of ATB Umwelttechnologien GmbH and/or if the following safety information is disregarded, this can lead to malfunction of or defects in the plant. In this case any liability is ruled out.
  • Page 3 Transition of cursor to the character, which is to be changed / value input is saved / selection of menu point / menu setback. With temperatures below 0°C a severely limited function of the LC display is to be anticipated. ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com...
  • Page 4 With yes the sludge return feed is suppressed for half a year (run-in phase). Test run In test run operation the current float level and the current power input are indicated. Pressing OK carries out the test run. ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com...
  • Page 5 In the case of malfunction, in addition, the fault which has occurred is indicated. By a single pressing of any key the background lighting is activated lapses 5 minutes after the last operation of a key). ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com...
  • Page 6: Main Level

    Time period between batches. Deni phase: Duration of the denitrification phase. The denitrification phase is component part of the aeration phase and takes place following the charging. ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com...
  • Page 7 (no further reduction in winter operation). Following successful activation this function is blocked for six months. Signal sound Selection of the volume of the alarm sound. ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com...
  • Page 8 In the Service Mode all parameters relevant and necessary for the operation of the wastewater treatment plant are set and changed. Please note that false inputs can lead to a faulty process! The inputs are not checked for plausibility! ATB Umwelttechnologien GmbH rejects any claims under warranty for the results of inappropriate inputs! Our service department will be very happy to provide you with support.
  • Page 9 Following acknowledgement of an error message this, with a renewed occurrence over a period of 72 hours, is suppressed. If this is not wanted, i.e. the error should be reported immediately with the next occurrence, press OK. ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com...
  • Page 10: Pre-Set Parameters

    The setting of the control system takes place to the above details. The table is saved in the control unit; a manual input of the individual values is not necessary and at this point serves solely for checking. ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com...
  • Page 11 Press the ▲ and OK keys simultaneously. A renewed acoustic signal indicates the successful transfer of data. The data can be read subsequently as an Excel file. © ATBcontrol 3 – Control Circuit Board ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com...
  • Page 12: Potential-Free Contact

    The contact functions as break contact (opener) to the terminals 11 and 12 (with activated fault indication). 11 - C (common): common lead 12 - NC (normally closed): break contact 14 - NO (normally open): closing contact ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com...
  • Page 13: Technical Data

    It is recommended to have the accumulators exchanged every two years by an authorised specialist firm. The exchange of the accumulators with batteries is forbidden due to the danger of explosion! ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com...
  • Page 14: Ec Declaration Of Conformity

    Design changes, which have effects on the technical data given in the Operator’s Handbook and on the use in accordance with the regulations, make this Declaration of Conformity invalid! Porta Westfalica, 05.06.2013 Markus Baumann (Managing Director) ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com...
  • Page 15 ATB WATER GmbH, Südstraße 2, D-32457 Porta Westfalica, www.atbwater.com...

Table of Contents