Do you have a question about the TANKASMIN and is the answer not in the manual?
Questions and answers
Summary of Contents for Millipore TANKASMIN
Page 1
Automatic Sanitization Module User Manual Model: TANKASMIN...
Page 2
Millipore Corporation assumes no responsibility for any errors that might appear in this document. This manual is believed to be complete and accurate at the time of publication. In no event shall Millipore Corporation be liable for incidental or consequential damages in connection with or arising from the use of this manual.
Page 4
Safety Information Statement The ASM and other equipment must be operated according to the instructions in this manual. In particular, the hydraulic and electrical specifications must be followed and met. It is important to use this equipment as specified in this manual;...
Function The Automatic Sanitization Module (ASM) is designed to be fitted on Millipore water storage reservoirs such as the 30 L, 60 L or 100 L PE Reservoirs or the SDS 200/350. The ASM is electrically powered and controlled by an adjacent water system.
Product information, Continued Weight and ASM weight dimensions The ASM weighs 1 kg. ASM dimensions Specification Value Height 320 mm Width 170 mm Power cable The maximum length of the power cable is 5 m. Electrical The table shows the value of each specification. specifications Specification Value...
THE INFORMATION IN THIS PAGE IS MEANT TO BE USED BY A QUALIFIED MILLIPORE SERVICE REPRESENTATIVE ASM installation UV lamp Before proceeding, make sure the ASM is not electrically connected to the Water System. The following procedure shows the installation of the UV lamp.
THE INFORMATION IN THIS PAGE IS MEANT TO BE USED BY A QUALIFIED MILLIPORE SERVICE REPRESENTATIVE ASM installation, Continued ASM on a Put the ASM onto the top of the Reservoir by following the steps below. reservoir Step Action Remove the lid coming with the storage reservoir. This lid will no longer be used.
THE INFORMATION IN THIS PAGE IS MEANT TO BE USED BY A QUALIFIED MILLIPORE SERVICE REPRESENTATIVE ASM installation, Continued Software The ASM must be activated into the water system software. activation • In the Service Menu, go in CONFIG and ASM Activation.
ASM programming Access the Manager Menu in Standby Mode, go in Manager Menu access • Standby Menu, • access the Manager Menu, • go to Setup • and then to ASM Lamp Schedule. ASM Lamp The “ASM Lamp Schedule” software function is used to program the Schedule illumination cycles of the ASM UV lamp.
ASM programming, Continued • This table shows an example of “ASM UV Lamp Schedule” display. Example Cycle Description The ASM UV lamp is powered at 07:00 for 15 min. The ASM UV lamp is powered at 08:30 for 5 min. The ASM UV lamp is powered at 12:00 for 5 min.
• It is recommended to have a Millipore Field Representative replace the UV lamp. Contact Millipore for a copy of these instructions if you want to replace the UV Lamp by yourself. • If the UV lamp is replaced, then the ASM UV Lamp needs to be registered via the Maintenance Software.
Maintenance, Continued • Periodically visually check that the quartz sleeve is clean and free of Quartz sleeve cleaning anything that would interfere with the transmission of UV light. • If necessary, clean with an ethanol soaked cloth in order to maintain the effectiveness of the UV lamp.
Ordering information Catalogue The consumables catalogue numbers are found below. numbers Item Catalogue number Automatic Sanitization Module TANKASMIN 254 nm UV lamp ZLXUVLPL1 215 mm quartz sleeve ZF3000219...
Need help?
Do you have a question about the TANKASMIN and is the answer not in the manual?
Questions and answers