Load-bearing tower Staxo 40
with brief design as per Eurocode
User Information
Instructions for assembly and use (Method statement)
© by Doka GmbH, A-3300 Amstetten

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Staxo 40 and is the answer not in the manual?

Questions and answers

Summary of Contents for Doka Staxo 40

  • Page 1 999805002 09/2018 en-GB The Formwork Experts. Load-bearing tower Staxo 40 with brief design as per Eurocode User Information Instructions for assembly and use (Method statement) © by Doka GmbH, A-3300 Amstetten...
  • Page 2 User Information Load-bearing tower Staxo 40 999805002 - 09/2018...
  • Page 3: Table Of Contents

    User Information Load-bearing tower Staxo 40 Contents Introduction Elementary safety warnings Doka services System description System overview Staxo 40 in detail Practical examples Examples of the system in action Adapting to different layouts, heights and loads Extending the range of use with brackets...
  • Page 4: Introduction

    This booklet is aimed at all persons who will be work- This document can also be used as a generally valid ing with the Doka product or system that it describes. set of Instructions for Assembly and Use (Method It contains information on the standard design for...
  • Page 5 ▪ It is strictly forbidden to weld Doka products – in par- ticular anchoring/tying components, suspension components, connector components and castings etc. – or otherwise subject them to heating.
  • Page 6 The following symbols are used in this document: Observe all country-specific regulations applying to the handling of formwork and scaffolding. For system formwork the Doka slinging means stated in this DANGER booklet must be used – this is a mandatory require- This is a notifier drawing attention to an ment.
  • Page 7: Doka Services

    Every single project is unique and calls for individual- ▪ Depot management ised solutions. When it comes to the forming opera- tions, the Doka team can help you with its consulting, Pre-assembly and assembly planning and ancillary services in the field, enabling ▪...
  • Page 8: System Description

    (e.g. hotel entrance lobbies) ▪ for low slab loads ▪ Staxo 40's load-bearing capacity of up to 45 kN per leg is thus economically optimised for shoring-tower superstructures that use double H20 beams as their primary beams ▪...
  • Page 9 User Information Load-bearing tower Staxo 40 System description 98024-301-01 The tower-to-tower walkway opening and gapless, full-area assembly levels ensure fast, safe working inside the scaffold and beneath the super- structure 999805002 - 09/2018...
  • Page 10: System Overview

    System description User Information Load-bearing tower Staxo 40 System overview Basic design concept The Staxo 40 system components Head units (A) Staxo 40 4-way Staxo 40 4-way Staxo 40 screw Staxo 40 screw screw-jack screw-jack jack U-head jack U-head head 30cm...
  • Page 11 User Information Load-bearing tower Staxo 40 System description Diagonal crosses (C) Base units (D) Drop-in steel-tube bracing crosses Staxo 40 screw-jack foot 30cm Staxo 40 screw-jack foot 70cm between the frames. Identified by: ▪ Embossed marking (G) e.g. 18.250 - 18 = frame height 1.80 m...
  • Page 12: Staxo 40 In Detail

    System description User Information Load-bearing tower Staxo 40 Staxo 40 in detail Features of the Staxo 40 frames Framework scaffolding with passageway opening created by inverting the frames Turning the frames upside-down creates ample head- room for safe working inside the scaffold and beneath the towerframe superstructure.
  • Page 13 User Information Load-bearing tower Staxo 40 System description Safety catch Anchorage points for personal fall arrest systems (PFAS) ▪ tried-and-tested interconnection system (captive) ▪ secures the diagonal crosses ▪ two defined positions (closed – open) Closed Open WARNING ➤ Make sure that the anchorage point is at or...
  • Page 14 System description User Information Load-bearing tower Staxo 40 Many possible ways of connecting couplers On the horizontal profile – on all types of frame On vertical tubes – Staxo 40 frame 1.80m 98024-233-01 a ... 34 cm b ... 11 cm...
  • Page 15 Staxo 40 coupler Staxo 40 anti-dropout lock (E) The vertically stacked frames are attached to one another by the Staxo 40 coupler with its integrated A crane-handling-safe link, using a Staxo 40 anti-drop- stop-ring. out lock, is required in the following cases: Because this coupler extends such a long way (15 cm) ▪...
  • Page 16: Practical Examples

    D Handrail post T 1.80m (optionally with Toeboard holder T 1.80m), Edge protection system XP, Handrail clamp S or Handrail post 1.50m E Lashing strap 5.00m F Doka express anchor 16x125mm and Doka coil 16mm WARNING ➤ Where formwork beams cantilever out a long way, secure them against accidental lift-out.
  • Page 17 Tower tip-up is prevented by e.g. a plumbing strut. 98024-235-01 Safe access routes around slab- edges With the Staxo 40 bracket 90cm and using e.g. a plumbing strut to prevent tower tip-up. 98024-287-01 98024-262-01 999805002 - 09/2018...
  • Page 18 System description User Information Load-bearing tower Staxo 40 Flexible adaptation to the structure. Combining with floor props Extra frame-plane Independently of the system-grid, an extra frame-plane can be added with the aid of scaffold tubes. 8024-341 96615-227-01 x ... continuously adjustable from 20 cm to 150 cm A Bracing with scaffold tubes 48.3mm...
  • Page 19: Examples Of The System In Action

    User Information Load-bearing tower Staxo 40 System description Examples of the system in action 999805002 - 09/2018...
  • Page 20 System description User Information Load-bearing tower Staxo 40 999805002 - 09/2018...
  • Page 21: Adapting To Different Layouts, Heights And Loads

    User Information Load-bearing tower Staxo 40 System description Adapting to different layouts, heights and loads The different sizes of diagonal brace for each height of In this way, only as much material is used as is really frame enable the frames to be spaced close together or needed.
  • Page 22 System description User Information Load-bearing tower Staxo 40 Height ranges and materials schedule Choose the right diagonal crosses for the distance between the frames. NOTICE ▪ The minimum values h given in Table A min. are only applicable if the biggest possible frame is always used in the base section.
  • Page 23 15.5 26.4 15.5 15.5 26.4 Values in cm Min. values with no formwork-striking play Table C: Base zone Staxo 40 screw-jack foot 30cm Staxo 40 screw-jack foot 70cm Frames in the base 'storey' 1.80m 1.20m 0.90m 1.80m 1.20m 0.90m max.
  • Page 24 System description User Information Load-bearing tower Staxo 40 on single-storey towers Note: For towers consisting of one 'storey' only, the min. val- ues L and L stated for the screwjack head and base units in the previous Tables will often not be reached.
  • Page 25: Extending The Range Of Use With Brackets

    Install a Staxo 40 frame strut 1.40m if the pull-point or pressure point of the bracket is not supported. Bolt the Staxo 40 bracket 90cm to the top of the diagonal tube of the frame and secure the bolt. Insert and secure the bottom bolt, to prevent acci- dental lift-out.
  • Page 26 All frames arranged with horizontal profile at bottom = A Staxo 40 bracket 90cm pull-point of bracket is not supported = Staxo 40 frame B Handrail post XP 1.20m or Staxo 40 4-way screw-jack head / strut 1.40m is needed. Screw-jack U-head E Staxo 40 frame strut 1.40m...
  • Page 27 User Information Load-bearing tower Staxo 40 System description Close-up with Handrail post XP 1.20m Using scaffolding tubes 98024-294-01 A Scaffold tube holder D48mm B Scaffold tube 48.3mm C Toeboard holder XP 1.20m D Handrail post XP 1.20m Follow the directions in the 'Edge protection...
  • Page 28 98024-342-02 Staxo 40 frame 1.20m or 0.90m (with horizontal profile at top) Note: In the case of the Staxo 40 frame 1.80m, the Staxo 40 frame strut has to be pinned into the bottom hole (illus- tration on right). 98024-271-01 a ...
  • Page 29 98024-309-01 A Staxo 40 bracket 90cm B Staxo 40 screw-jack U-head or 4-way screw-jack head F Plumbing strut 340 IB or 540 IB with Strut shoe EB Screw-on coupler 48mm 95 J Doka express anchor 16x125mm + Doka coil 16mm...
  • Page 30 Close-up showing how the plumbing strut is fixed to the ground Extra shoring of bracket The Staxo 40 bracket 90cm can also be used for trans- ferring concreting loads. The extra plumbing strut attached to every bracket ensures that no compressive forces are transferred into the load-bearing tower.
  • Page 31: Linking Towers / Placing Assembly-Level Planking Between Towers

    Linking towers / placing assembly-level planking between towers Scaffold planking units between the Staxo 40 planking struts are sturdy, stable elements for linking Staxo 40 tower units, that can also carry plank- towers ing units. The struts are available in 3 different lengths for inter- frame spacings of 1.00m, 1.50m and 2.00m.
  • Page 32 System description User Information Load-bearing tower Staxo 40 Planking struts as part of bracing configurations The planking struts and extra scaffold tubes can be used to make a complete horizontal framework, e.g. for bracing towers that are over 11 m tall.
  • Page 33: Assembly (Overview)

    User Information Load-bearing tower Staxo 40 Assembly (overview) Assembly (overview) Set-up configurations Load-bearing tower Staxo 40 Horizontal assembly Assembling in the Standard set-up upright 980 -2 -01 24 57 024-21 -01 with Fork lift shifting by hand device TG With 'mounted-ahead' 1.20m frames and...
  • Page 34 Set-up configuration with full-area assembly level Other set-up configurations beneath the superstructure. With Staxo 40, tower-to-tower passageways are possi- ble at any height and in any direction. Alongside the usual tower-erection methods, this makes possible a number of other methods for tower assembly.
  • Page 35: Horizontal Assembly

    98024-216-01 D Frame E Yellow locking spring K Diagonal cross ➤ Insert screwjack base units and secure them with Staxo 40 anti-dropout locks. See also the section entitled 'Lifting by crane'. Close-up 98024-217-01 F Diagonal cross 98024-232-01 999805002 - 09/2018...
  • Page 36 Do not pre-assemble units any higher than 11 m. 'Assembling towers in the upright with 'mounted-ahead' railings'. ➤ Fit a Staxo 40 coupler and push the next frame onto 98024-215-01 ➤ Use Staxo 40 tube connectors D48.3mm to make crane-handling-safe links between the frames at every joint.
  • Page 37 Fitting the head unit overloading of the system. ➤ Ensure that all loads are applied centrally! ➤ Insert the head unit and secure it with Staxo 40 anti- dropout lock. 9776-102-01 024-21 -02 J Head unit K Staxo 40 anti-dropout lock 024-21 -01 h ...
  • Page 38 Inter-frame space + 1.00 m upright. ▪ 6 x Screw-on coupler 48mm 95 (H) ▪ 4 x Staxo 40 frame strut 1.40m (I) ➤ Mount Staxo 40 frame struts in the bottom and top 'storeys' ➤ Attach scaffold tubes:...
  • Page 39 User Information Load-bearing tower Staxo 40 Horizontal assembly 980 -218-01 a ... min. 0.5 m b ... max. 0.2 m G Scaffold tube 48.3mm H Screw-on coupler 48mm 95 Staxo 40 frame strut 1.40m Dismantling After the tower has been placed back on its side, it can be dismantled in reverse order.
  • Page 40: Assembling Towers In The Upright

    As a rule: ▪ In this erection method, the horizontal profile of the Staxo 40 frame 1.20m must always be on top, to ensure fall protection. 98024-267-01 ➤ Connect the frames together with diagonal crosses.
  • Page 41 Push diagonal crosses onto the bottom safety-catch bolts and secure them with the safety catches. 98024-261-01 F Diagonal cross ➤ Insert Staxo 40 couplers in the same way as in the first 'storey'. 980 -2 -01 24 59 F Diagonal cross...
  • Page 42 Assembling towers in the upright User Information Load-bearing tower Staxo 40 Erecting further storeys Horizontal bracing ➤ NOTICE Add further frames in the same way as for the 3rd 'storey', and brace them in the vertical with diagonal If no scaffold planking units are used, or if crosses.
  • Page 43 User Information Load-bearing tower Staxo 40 Assembling towers in the upright Head zone Dismantling To dismantle, perform the above steps in reverse order. Fitting the head unit NOTICE ➤ Insert the head unit. As early as in the planning phase, considera- tion should also be given to the dismantling operations (e.g.
  • Page 44: Assembling In The Upright With 'Move-Up' Front And Side Railings

    24 316 G Scaffold planking 30/...cm ➤ Close the anti-liftout guard. 98024-270-01 Installation example with Staxo 40 screw-jack foot 30cm and Staxo 40 4-way screw-jack head 30cm. Erecting the first storey 98024-295-01 ➤ Insert screwjack base units. Mounting the 'move-up' railings ➤...
  • Page 45 Note: If it is intended to crane-lift the tower, the frames must all be linked in a crane-handling-safe manner by Staxo 40 tube connectors D48.3mm. See also the sec- tion entitled 'Lifting by crane'. 98024-327-01 999805002 - 09/2018...
  • Page 46 980 - 24 317 980 - 24 318 G Scaffold planking 30/...cm H Scaffold planking 60/...cm with manhole ➤ Close the anti-liftout guard. 98024-295-01 ➤ Insert Staxo 40 couplers in the same way as in the first 'storey'. 999805002 - 09/2018...
  • Page 47 User Information Load-bearing tower Staxo 40 Assembling towers in the upright Head zone Horizontal bracing NOTICE Fitting the head unit If no scaffold planking units are used, or if these are removed before the tower is finally ➤ Insert the head unit.
  • Page 48: Assembling Towers In The Upright By Forklift Truck

    The Fork lift shifting device TG may only be used for Multi-purpose waling WS10 Top50 2.00m erecting, dismantling and transporting Doka load-bear- Connecting pin 10cm ing towers Staxo, Staxo 40, Staxo 100, Staxo 100 eco, Spring cotter 5mm d3 and d2. Scaffold tube 48.3mm 1.00m...
  • Page 49 User Information Load-bearing tower Staxo 40 Assembling towers in the upright Travelling the towerframe units Max. heights of load-bearing towers with superstructure without superstructure NOTICE Very important points for the moving pro- cedure: ▪ As well as the fork-lift driver, a specially...
  • Page 50: Repositioning

    Repositioning User Information Load-bearing tower Staxo 40 Repositioning Different ways of repositioning Using Staxo 40 shifting By forklift truck or By crane wheel telescoping stacker truck 98003-300-01 98024-324-01 98024-283-01 NOTICE ▪ The most suitable approach to repositioning and dismantling has to be discussed and agreed with the site in the project phase, especially for very tall towers.
  • Page 51: Repositioning Using Staxo 40 Shifting Wheel

    1000 kg 98024-322-02 (max. 4 Staxo 40 shifting wheels per unit) The Staxo 40 shifting wheel must not be used on Staxo 40 frames where the screw-jack feet have been NOTICE extended a long way. The extension length a of the ▪...
  • Page 52: Lifting By Crane

    Secure the head units so that they cannot be Spread-angle β max. 30°. lifted out ➤ Push a Staxo 40 anti-dropout lock over the nut and fix it by closing the safety catch on the frame. E Staxo 40 anti-dropout lock Secure the base units to prevent them dropping out ➤...
  • Page 53 User Information Load-bearing tower Staxo 40 Repositioning Repositioning towers with Connect the superstructure to the head units superstructure ➤ e.g. with Locking rod 15.0, Clamping plate and Wing nut 15.0. In addition to the action steps set out in 'Repositioning...
  • Page 54 Repositioning User Information Load-bearing tower Staxo 40 Mount the Lifting rod 15.0 Repositioning operation ➤ ➤ Mount the Lifting rod 15.0 and Retaining plate 15.0. Attach the crane sling to the Lifting rods 15.0 and lift the tableform to its next location. Spread-angle β...
  • Page 55: Lifting By Forklift Truck

    User Information Load-bearing tower Staxo 40 Repositioning Lifting by forklift truck Fork lift shifting device TG For product information on the Fork lift shifting device TG and the requirements in respect of the forklift truck, see the section entitled 'Assembling towers in the upright by forklift truck'.
  • Page 56: General Remarks

    General remarks User Information Load-bearing tower Staxo 40 General remarks Anchoring on the structure With Anchoring shoe for stair tower Q ... shear force Z ... tensile force Max. anchoring loads [kN] per Permitted loads [kN] anchor Concrete strength at the time of...
  • Page 57 User Information Load-bearing tower Staxo 40 General remarks Vertical distance between the anchoring levels ▪ will depend on the assembly method, the wind loads and the design assumptions NOTICE The load-bearing tower must be stiffened in the anchoring plane, either by a horizontal diagonal cross or by a scaffold-tube bracing.
  • Page 58: Back-Stays/Shoring Supports For The Load-Bearing Towers

    C Bracing for load-bearing towers With high loads and long back-stays, watch out for any elongation of the back-stay! G Spindle connecting plate T H Staxo 40 4-way screw-jack head 70cm or Staxo 40 screw-jack U-head 70cm 999805002 - 09/2018...
  • Page 59 User Information Load-bearing tower Staxo 40 General remarks Anchored with Doka Express anchor 16x125mm Permitted horizontal force H: 4 kN Note: Anchoring with standard products The 'Shoe (complete)' must be turned by 180° in the horizontal. 9734-287-02 A ... Back-stay force Q ...
  • Page 60 General remarks User Information Load-bearing tower Staxo 40 Bracing waling connector WS10 E Bracing for load-bearing towers – without 'Shoe (complete)' F Eye-lug anchor 15.0 without tie rod The Bracing waling connector WS10 is used for bracing G Connecting pin 10cm and Spring cotter 5mm...
  • Page 61 Holes in plumbing strut shoe Eurex 60: 9745-222-03 Tr717-200-02 a ... diam. 28 mm Characteristic cube compressive strength of the con- b ... diam. 18 mm (suitable for Doka express anchors) crete (f ck,cube,current min. 30 N/mm (C25/30 concrete) Anchoring the footplate...
  • Page 62 General remarks User Information Load-bearing tower Staxo 40 Mounting in multi-purpose waling Mounting on screwjack head unit 980 - 24 244 980 -339-01 H ... Horizontal force H ... Horizontal force V ... Resulting vertical force from H V ... Resulting vertical force from H A ...
  • Page 63 A Load-bearing tower B Plumbing strut 340 IB or 540 IB C Screw-on coupler 48mm 95 D Strut shoe EB E Doka express anchor 16x125mm and Doka coil 16mm Perm. A ≤ 13.5 kN EN 74 compliant couplers ▪ Class A perm. V ≤ 6 kN CAUTION ➤...
  • Page 64 Doka Express anchor 16x125mm NOTICE The whole tower unit must be linked together in a crane-handling-safe way using Staxo 40 anti-dropout locks and Staxo 40 tube connec- tors. See the section headed 'Lifting by crane' ➤...
  • Page 65: Inclination Adjustment

    User Information Load-bearing tower Staxo 40 General remarks Inclination adjustment using Staxo wedge support WS10 If the superstructure or the ground are inclined at an angle of 1% or more, slope compensation must be provided. Used with timber wedges, this component provides angle adjustment to floor-slab constructions with a using Wedges for screw-jack ..
  • Page 66 12 % (in both the ▪ longitudinal and transverse directions) – to Additional height of the Swivel bearing plate attach 2 Doka H20 beams (K) to each multi- for Screw jack U-head (92 mm). purpose waling using Flange-clamps H20 (L) . ▪...
  • Page 67 User Information Load-bearing tower Staxo 40 General remarks ➤ with Compensating plate Make sure that the 'Compensating plate' is sitting firmly, and check that the leg is in the vertical. The 'Compensating plate' is made of tough plastic and is used to compensate for sloping support surfaces beneath load-bearing towers, without limiting their load- bearing capacity.
  • Page 68: Secondary-Beam Stabilisers

    Note: In certain special situations, (e.g. when forming inclined floor-slabs), Secondary-beam stabilisers can also be used for transferring horizontal loads. For more information, please contact your Doka techni- cian. How to mount: ➤ Hang the Secondary-beam stabilisers into place with an Alu beam fork H20.
  • Page 69: Forming Downstand Beams

    TR1009-202-01 A Staxo 40 spindle adapter B Staxo 40 screw jack U-head 30cm C Staxo 40 frame D Multi-purpose waling WS10 Top50 G Anti-twist lock (prevents the Staxo 40 spindle adapter from being turned out of position) 999805002 - 09/2018...
  • Page 70 General remarks User Information Load-bearing tower Staxo 40 ➤ Next, fit on a Staxo 40 4-way screw-jack head 70cm. TR1009-202-02 A Staxo 40 spindle adapter E Staxo 40 4-way screw-jack head 70cm 999805002 - 09/2018...
  • Page 71: Combining The System With Standard Components From Other Doka Formwork Systems

    User Information Load-bearing tower Staxo 40 General remarks Combining the system with standard components from other Doka formwork systems Using head units from the Dokaflex 1- Using braces from the Load-bearing 2-4 and Doka Xtra floor-slab systems tower d2 system...
  • Page 72: Combining With Dokamatic Tables

    General remarks User Information Load-bearing tower Staxo 40 Combining with Dokamatic tables Superstructure attached by Assembly Dokamatic table Staxo spindle ➤ Mount a Screw-jack foot on the top frame. connectors ➤ Bolt the 'Dokamatic table Staxo spindle connector' onto the Screw-jack foot.
  • Page 73 User Information Load-bearing tower Staxo 40 General remarks ➤ Inclinations Fit Connecting pins 10cm to connect the table, and secure these with spring cotters. The second con- necting pin on each longitudinal connection prevents using Wedges for screw-jack ..% (hardwood any displacement of the table superstructure.
  • Page 74: Transporting, Stacking And Storing

    Multi-trip packaging such as containers, stacking pal- lets and skeleton transport boxes keep everything in The stackable Staxo 40 pallets are an alternative to place on the site, minimise time wasted searching for wooden pallets for stacking Staxo 40 frames.
  • Page 75 User Information Load-bearing tower Staxo 40 General remarks ➤ Loading the transport device Stack all the other Staxo 40 frames so that they are alternately above one another (max. 40 high) ➤ Secure the Staxo 40 frames with the lashing strap.
  • Page 76 User Information Load-bearing tower Staxo 40 NOTICE ▪ The rating plate must be in place and clearly legible. ▪ Make sure that the Staxo 40 frames are centrally positioned! ▪ Observe the 'Stacking instruction' sticker! Stacking and storing empty Staxo 40 pallets NOTICE...
  • Page 77 ▪ pallet stacking truck ▪ forklift truck To make the Doka skeleton transport box easier to load and unload, one of its sidewalls can be opened. Max. load: 700 kg (1540 lbs) Permitted imposed load: 3150 kg (6950 lbs) NOTICE 9234-203-01 ▪...
  • Page 78 General remarks User Information Load-bearing tower Staxo 40 Doka multi-trip transport box Using Doka multi-trip transport boxes as storage units 1.20x0.80m galv. Max. n° of boxes on top of one another Outdoors (on the site) Indoors Floor gradient up to 3%...
  • Page 79 How to use with bolt-on castor set: Always apply the fixing brake when the container is ‘parked’. When Doka stacking pallets are stacked, the bottom pallet must NOT be one with a bolt-on caster set mounted to it. 999805002 - 09/2018...
  • Page 80 ▪ pallet stacking truck 92816-206-01 ▪ forklift truck The Doka accessory box is the tidy, easy-to-find way of Repositioning by forklift truck or pallet stacking storing and stacking all interconnection and form-tie truck components. The forks can be inserted under either the broadside or Max.
  • Page 81: Structural Design

    ▪ The calculated values are in line with the type test for 'Load-bearing tower Staxo 40', the Calculation guide 'Load-bearing tower Staxo 40' and thus also with EN 12812 and EN 1993. ▪ In all cases which differ from the stated boundary...
  • Page 82 Single primary beams with Double primary beams with of timber formwork beams of timber formwork beams to DIN EN 13377 to DIN EN 13377 Single primary beam with Doka beams I tec 20 Centring beams to Z-9.1-773 98035-210-01 Multi-purpose walings ][100 to ][160...
  • Page 83 User Information Load-bearing tower Staxo 40 Structural design Bracing 98024-302-01 D Swivel coupler 48mm F Split nut B T Heavy-duty screw jack 70 V Heavy-duty screw jack 70 top Y Extra bracing is only necessary if the screw-jack heads are not connected with one another by way of the formwork base.
  • Page 84 Structural design User Information Load-bearing tower Staxo 40 Permitted leg loads Free-standing systems (without back-stay, without holding device) Screw-jack extension lengths Max. height [m] of [cm] load-bearing tower Permitted leg load [kN] at top and bottom respectively N° of frame planes...
  • Page 85: Component Overview

    User Information Load-bearing tower Staxo 40 Component overview [kg] Article n° [kg] Article n° Component overview [kg] Article n° Staxo 40 frame 0.90m 14.6 582202000 Diagonal brace d2 9.100 2.0 582740000 Staxo 40 frame 1.20m 17.5 582201000 Diagonal brace d2 9.125 2.2 582741000...
  • Page 86 Component overview User Information Load-bearing tower Staxo 40 [kg] Article n° [kg] Article n° Staxo 40 screw jack U-head 70cm 7.0 582208000 Super plate 15.0 1.1 581966000 Staxo 40-Kopfspindel 70cm Superplatte 15,0 Galvanised Galvanised Height: 105.5 cm Height: 6 cm...
  • Page 87 User Information Load-bearing tower Staxo 40 Component overview [kg] Article n° [kg] Article n° Plumbing strut Eurex 60 550 42.5 582658000 Plumbing strut 340 IB EF 14.9 588247500 Justierstütze Eurex 60 550 Justierstütze 340 IB EF Powder-coated blue Galvanised Aluminium Length: 190.8 - 341.8 cm...
  • Page 88 Component overview User Information Load-bearing tower Staxo 40 [kg] Article n° [kg] Article n° Universal dismantling tool 3.7 582768000 Staxo 40 planking strut 1.00m 5.7 582215000 Universal-Lösewerkzeug Staxo 40 planking strut 1.50m 7.3 582216000 Staxo 40 planking strut 2.00m 9.3 582217000...
  • Page 89 User Information Load-bearing tower Staxo 40 Component overview [kg] Article n° [kg] Article n° Staxo 40 ladder 2.30m 14.8 582219000 Cone screw B 7cm 0.86 581444000 Staxo 40-Leiter 2,30m Konusschraube B 7cm Galvanised Length: 10 cm Diameter: 7 cm Width-across: 50 mm Handrail post XP 1.20m...
  • Page 90 Component overview User Information Load-bearing tower Staxo 40 [kg] Article n° [kg] Article n° Bracing waling connector WS10 2.7 582756000 Multi-purpose waling WS10 Top50 2.00m 38.9 580007000 Abspann-Riegelverbinder WS10 Mehrzweckriegel WS10 Top50 2,00m Galvanised Painted blue Length: 46.7 cm Secondary-beam stabiliser 1 1.6 586196000...
  • Page 91 User Information Load-bearing tower Staxo 40 Component overview [kg] Article n° [kg] Article n° Doka multi-trip transport box 1.20x0.80m 70.0 583011000 Doka-Mehrwegcontainer 1,20x0,80m Galvanised Height: 78 cm Multi-trip transport box partition 0.80m 3.7 583018000 Multi-trip transport box partition 1.20m 5.5 583017000...
  • Page 92 70 countries, the Doka Group has a highly efficient dis- than 6000. tribution network which ensures that equipment and www.doka.com/staxo-40 Doka GmbH | Josef Umdasch Platz 1 | 3300 Amstetten | Austria | T +43 7472 605-0 | F +43 7472 66430 | info@doka.com | www.doka.com 999805002 - 09/2018...