FläktGroup ECONET EQRZ-05 Installation And Maintenance Instructions Manual

Exchanger package

Advertisement

Quick Links

ECONET
EXCHANGER PACKAGE
®
EQRZ-05 AND LQRZ-05
INSTALLATION AND MAINTENANCE INSTRUCTIONS
SCOPE OF DELIVERY
SYSTEM OVERVIEW
The Exchanger Package illustrated in the figure is delivered separately
from the AHU and the ECONET
®
pump unit. Basically, the Exchanger
Package consist of one or two plate heat exchangers for connection to
an external heating and/or cooling system.
The pipework within the ECONET
against rusting and insulated with Armaflex.
The ECONET
®
Exchanger Package comes with a stand for mounting on
a flat floor.
FläktGroup
DC_8842GB 20180328_R0
Exchanger Package is protected
®
CONTENTS
SCOPE OF DELIVERY ....................................................................................................1
ECONET
EXCHANGER PACKAGE ......................................................................... 2
®
ASSEMBLY AND INSTALLATION ..............................................................................4
SPARE PARTS LIST .......................................................................................................5
PRODUCT CODE .............................................................................................................6
3
3
2
2
1
1.
Plate heat exchangers for supplementary heating/cooling
2. Pipes for ECONET
pump unit
®
3. Shut-off valves
4. Drain valve, Filling valve
5. Specially designed stand
6. Expansion vessel with a safety valve
Every pipe is marked with the necessary connection information.
PAGE
6
1
4
5
Specifications are subject to alteration without notice

Advertisement

loading

Summary of Contents for FläktGroup ECONET EQRZ-05

  • Page 1 ECONET EXCHANGER PACKAGE ® EQRZ-05 AND LQRZ-05 INSTALLATION AND MAINTENANCE INSTRUCTIONS CONTENTS PAGE SCOPE OF DELIVERY ....................1 ECONET EXCHANGER PACKAGE ................. 2 ® ASSEMBLY AND INSTALLATION ................4 SPARE PARTS LIST .......................5 PRODUCT CODE ......................6 SCOPE OF DELIVERY SYSTEM OVERVIEW The Exchanger Package illustrated in the figure is delivered separately from the AHU and the ECONET ®...
  • Page 2 Installation and maintenance instructions ECONET EXCHANGER PACKAGE ® The pipe connections are male pipe threads from DN25 to DN50. The connections on the primary side against the plate exchangers are female pipe threads from DN25 to DN50. For dimensions DN65 and The ECONET Exchanger Package contsists of one or two plate heat ®...
  • Page 3 Installation and maintenance instructions PIPE INSTALLATION General ECONET instructions can be found in ECONET manual 8750. ® ® This instruction only covers what is valid for the ECONET Exchanger – Installation of pipes between the ECONET Exchanger Package and ® ®...
  • Page 4 Installation and maintenance instructions ASSEMBLY AND INSTALLATION A purging valve must be fitted at the PIPE INSTALLATION highest point in the system. Connection to the pipe system should be carried out by the plumbing contractor. With the pipes installed correctly, the ECONET Exchanger needs to be ®...
  • Page 5 Installation and maintenance instructions SPARE PARTS LIST POS 1 PLATE HEAT EXCHANGER dd=ff=35 eee=ggg=60 B35H x 60 Maker: SWEP dd=ff=35 eee=ggg=70 B35H x 70 FWG ordering code EQRS-05 and LQRZ-05 dd=ff=35 eee=ggg=80 B35H x 80 dd=ff=35 eee=ggg=90 B35H x 90 Code Spare part dd=ff=35...
  • Page 6 Installation and maintenance instructions PRODUCT CODE (EQRZ-05-BBB-C-DD-EEE-FF-GGG-H, LQRZ-05-BB-C-DD-EEE-FF-GGG-H-I) Size (bbb/bb) eQ 005, 008, 009, 011, 014, 018, 020, 023, 027, 032, 036, 041, 045, 047, 050, 054, 056, 063, 068, 072, 079, 081, 090 eQL 60, 62, 64, 71, 73, 80, 82, 84 Heat exchangers for (c) 1 = Heating 2 = Cooling...