Caldertech Uniprep 7 Operating Instructions Manual

Rotary scraping tool

Advertisement

Quick Links

Uniprep 7
Rotary Scraping Tool
Operating Instructions
Product Code: 01-06-201
Revision: 02
Designed and Manufactured in the UK

Advertisement

Table of Contents
loading

Summary of Contents for Caldertech Uniprep 7

  • Page 1 Uniprep 7 Rotary Scraping Tool Operating Instructions Product Code: 01-06-201 Revision: 02 Designed and Manufactured in the UK...
  • Page 2: Table Of Contents

    Operating Instructions Uniprep 7 Rotary Scraping Tool Contents Contents Page Introduction 02. Safety Instructions 03. Operation 04. Removal After Completion 05. Specifications 06. Cutter Arm Parts Diagram 07. Mandrel Parts Diagram 08. Warranty Information 09. Certificate of Conformity Service and Repair...
  • Page 3: Introduction

    This product (Caldertech Uniprep 7) has been manufactured, inspected and tested in accordance with the ISO9001 quality control systems and procedures in place at Caldervale Technology Ltd, Dewsbury.
  • Page 4: Safety Instructions

    Operating Instructions Uniprep 7 Rotary Scraping Tool 02. Safety Instructions Safety Instructions Read and understand the whole instruction booklet before using the tool. 2. It is imperative that all possible precautions are made to avoid unexpected pipe movement when the tool is being used.
  • Page 5: Operation

    Operating Instructions Uniprep 7 Rotary Scraping Tool 03. Operation Operation Arm Extension Cutting Arm Wing Nuts T Screw Cutting Tip Angle Relief Wingnut Cutting Arm Release Knob Cutting Tip Crank Arm Feed Screw Hex Spanner Crank Arm T Screw Feed Screw...
  • Page 6 Operating Instructions Uniprep 7 Rotary Scraping Tool 03. Operation Pipe Preparation Inspect the end of the pipe to be scraped to ensure it has no damage or deep scores and that it is externally clean. 2. Check that the pipe is round. Ovality should be reduced where possible.
  • Page 7 Operating Instructions Uniprep 7 Rotary Scraping Tool 03. Operation 6. Loosen the two arm extension wing nuts, extend the scraper arm until it reaches the witness marking and lock in position. 7. Ensure the angle relief wing nut is tightened and does not allow the tool tip cartridge to pivot then release the cutting arm release knob and lower the spring-loaded scraper arm and blade onto the pipe.
  • Page 8: Removal After Completion

    Operating Instructions Uniprep 7 Rotary Scraping Tool 04. Removal After Completion Removal After Completion Use the Cutting arm T screw to release blade spring tension. 2. Lift and lock scraper arm using cutter arm release knob. 3. Ensure the angle relief wing nut is tightened and does not allow the tool tip cartridge to pivot.
  • Page 9: Specifications

    Operating Instructions Uniprep 7 Rotary Scraping Tool 05. Specifications Specifications Materials: Mild Steel EN3A, Stainless Steel, Nylon, Brass, Aluminum and Tungsten Carbide Finish: Natural / Zinc passivate to mild steel Assembled Dimensions: Max: H1300 x W1360 x D1300mm Min: H760 x W875 x D1275mm Depth of Cut: ≤0.2mm...
  • Page 10: Cutter Arm Parts Diagram

    Operating Instructions Uniprep 7 Rotary Scraping Tool 06. Cutter Arm Parts Diagram Cutter Arm Parts Diagram Part Product Code Description Feed Screw Arm Slider Box Clamping Pad and Screw Handle Plate Handle Shaft Plastic Handle T-Screw Height Adjusting Arm Load Cell...
  • Page 11: Mandrel Parts Diagram

    Operating Instructions Uniprep 7 Rotary Scraping Tool 07. Mandrel Parts Diagram Mandrel Parts Diagram Part Product Code Description Mandrel Shaft Inc Spacers Plain Mandrel Collar Threaded Mandrel Collar Straight Leg Slotted Leg Foot Piece Link Kit (Mandrel - legs, slotted leg - straight leg, leg - foot pad)
  • Page 12: Warranty Information

    Operating Instructions Uniprep 7 Rotary Scraping Tool 08. Warranty Information Warranty Information 1. Extent of Warranty a) Subject to clauses 2 and 3, Caldervale Technology Ltd warrants to the end-user customer that its products will be free from defects in materials and workmanship, for six months after the date of purchase by the end-user customer, subject to providing proof of purchase.
  • Page 13 Operating Instructions Uniprep 7 Rotary Scraping Tool 08. Warranty Information iv) Operation outside the products specifications; v) Improper site preparation or maintenance; vi) Faulty pipes. 3. Limitations of Warranty a) Caldervale Technology Ltd does not warrant the operation of any product to be uninterrupted or error free.
  • Page 14: Certificate Of Conformity

    Operating Instructions Uniprep 7 Rotary Scraping Tool 09. Certificate of Conformity Certificate of Conformity...
  • Page 15: Service And Repair

    Essential Environmental, Health and Safety Requirements. • If a Caldertech pipe preparation tool has reached the end of its useful working life and cannot be refurbished it must be sent to a licensed recycling facility for treatment. That will ensure the waste hierarchy requirements are met.
  • Page 16 INTERNATIONAL Caldervale Technology Ltd Bretfield Court, Dewsbury, West Yorkshire WF12 9BG, UK +44 (0)1924 469571 sales@caldertech.com caldertech.com AUSTRALIA / NZ Caldertech Australia Pty Ltd Unit 3/30 Juna Drive, Malaga WA 6090, Australia +61 (0)8 9209 1132 sales@caldertech.com.au caldertech.com.au...

Table of Contents