OPERATING MANUAL for BRAKE UNITS 2 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) ELECTRICAL SAFETY ELECTRICAL INSTALLATION WORK MUST ONLY BE CARRIED OUT AUTHORIZED QUALIFIED CRAFTSMAN. THE JB BRAKE UNIT CARRIES DANGEROUS VOLTAGE WHEN IT IS CONNECTED TO THE MAINS. THE JB BRAKE UNIT MUST BE EARTHED BY AN EARTH CONDUCTOR CONNECTED TO THE PE EARTH TERMINAL OF THE HEAT SINK.
OPERATING MANUAL for BRAKE UNITS 3 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) NOTES ON EMC LEGISLATION The CE mark refers to Directive 72/73/EEC (93/68) on low voltage and to [German] legislation on electromagnetic compatibility (EEC §5.2 9/92). JB brake units are designed in accordance with standard IEC 947-4-2 for category B public mains and are within the published electro- magnetic compatibility (EMC) limits.
OPERATING MANUAL for BRAKE UNITS 4 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) TABLE OF CONTENTS ELECTRICAL SAFETY ........................2 NOTES ON EMC LEGISLATION ......................3 TABLE OF CONTENTS ..........................4 PREFACE ..............................5 PURPOSE ..............................6 OPERATING PRINCIPLE.........................6 INSTALLATION ............................7 CONSTRUCTION ............................7 NOTES ON INSTALLATION ........................7 NOTES ON CONNECTION AND USE.....................8 POSITION OF THE ADJ.
OPERATING MANUAL for BRAKE UNITS 5 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) PREFACE The information contained in this manual refers exclusively to JB brake units. It is essential that you read this manual before installation and commissioning.
OPERATING MANUAL for BRAKE UNITS 6 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) PURPOSE JB brake units are intended to brake manufacturers' unbalanced motors or three-phase motors used in conjunction with vibrating machineries. In conjunction with an existing motor control system, or one to be installed separately, the JB brake unit is used to shorten the coasting period of the machine after it is switched off.
OPERATING MANUAL for BRAKE UNITS 7 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) INSTALLATION CONSTRUCTION The major components of JB brake units are as follows: Zeit Strom Zeit Strom JB10/...E000 JB26/...E000 JB16/...E000 JB40/...E000 JB52/...E000 1. Perspex cover 2.
OPERATING MANUAL for BRAKE UNITS 8 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) Mounting: Drilling plan: JB 10 and JB 16 Drilling plan: JB 26 and JB 52 The JB brake unit can be 137 mm 130 mm fastened to a mounting plate by four screws.
OPERATING MANUAL for BRAKE UNITS 9 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) ADJUSTMENT ELEMENTS IMPORTANT NOTE: Unauthorised resetting of the adjustment elements can cause malfunctions in the brake unit. Trimming potentiometers: Two trimming potentiometers are mounted on the control board. Operation of the trimming potentiometers: Setting the brake current I Extreme anti-clockwise setting: minimum brake current...
OPERATING MANUAL for BRAKE UNITS 10 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) Please check the following points before switching on the mains voltage: 1. The brake unit must be used in conjunction with the relevant vibrating machine. 2.
OPERATING MANUAL for BRAKE UNITS 11 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) • Release contactor K2 (or K3). K1 will pick up again. After the braking time (approximately 20 seconds) has elapsed, LED "B" will go out and braking contactor K1 will drop out.
OPERATING MANUAL for BRAKE UNITS 12 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) FAULT FINDING Please make a note of the following details before reporting a defect to our service department: − type of the braking unit (see rating plate) −...
OPERATING MANUAL for BRAKE UNITS 13 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) APPENDIX 12.1 TECHNICAL DATA Nominal mains voltage 230, 400, 500 from JB26/... also 690 V Mains voltage ranges with 230V: 200 - 240 V with 400V: 380 - 430 V with 500V: 440 - 550 V with 690V: 600 - 700 V...
Page 14
OPERATING MANUAL for BRAKE UNITS 14 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) Operating temperature 0°C to + 40°C Storage and transport temp. - 10°C to + 85°C Installation position vertical Weight 1.3 kg (JB10.., JB16..) 7,5 kg (JB26.., JB40.., JB52..) Dimensions 158 x 185 x 110 mm for JB10..., JB16...
OPERATING MANUAL for BRAKE UNITS 15 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) 12.2 TYPE KEY The designation of the JB brake unit on the rating plate is made up as follows: JB10/ 400 E000 Execution: E000: separately mounted unit (G000: Motor braking unit in an enclosure) Nominal mains voltage [V] 230 / 400 / 500 / 690...
OPERATING MANUAL for BRAKE UNITS 16 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) 12.4 LINE REACTOR - Allocation / Dimensions / Weight Only with the brake unit Type JB16/500E000 a line reactor must be inserted into the inlet to clamp „8”. This line reactor is delivered loose. With the types JB26, 40, 52 the line reactor is already built in the unit.
OPERATING MANUAL for BRAKE UNITS 17 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) 12.5 CONNECTION DIAGRAMM (example for 1 motor) F4 L JB../...E000 BRAKING U V W MOTOR VIBRATOR EXAMPLE FOR CONTROL CIRCUIT WITH PLC...
OPERATING MANUAL for BRAKE UNITS 18 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) 12.6 CONNECTION DIAGRAMM (example for 2 motors) F4 L K2 K3 JB../...E000 BRAKING MOTORS VIBRATOR VIBRATOR EXAMPLE FOR CONTROL CIRCUIT WITH PLC...
OPERATING MANUAL for BRAKE UNITS 19 of 19 JB10/... JB16/... JB26/... JB40/... JB52/... 01.96/00/Scho (Installation set) CONNECTION DIAGRAMM JB10/...E000 12.7 (example 2 motors each with In <1,5A) JB10/...E000 BRAKING MOTORS (In < 1,5A) (In < 1,5A) Vibrator Vibrator Direction of rotation: Example for control circuit with PLC Please note the operating manual! *) L1: See Chapter 12.4...