Summary of Contents for Europa components TPN Series
Page 1
TPN 3 Phase Extension Boxes Important Information This unit must be installed by a qualified competent person in compliance with current requirements for Electrical Installations (IEE Wiring regulations Seventeenth Edition: BS7671). ! Ensure that all power supplying this equipment is switched OFF before working on or inside the unit. ! Confirm the power is off with an appropriately rated volt-sensing device.
Page 2
Quality Components at Competitive Prices Fitting Instructions: First mount and screw the TPN distribution board to the wall, leaving enough room below or above to site the enclosure, as per the instructions that come with the TPN three phase board. Remove the inner mounting plate of the extension box and leave to one side.
Page 3
Technical Data: TPNMM Three Phase Board Meter Instructions: The meter has already been programmed and is ready to use, but should the meter need to be re-programmed in order to add other features then the following process should be followed. Before a setting can be changed the meter has to be entered into programme mode. Display Meaning Display...
Page 4
Technical Data: TPNMM Set Voltage and Current Transformer Ratios: n3.3 = 3 Wire 3 Phase CodE In.Pr In.Pr In.Pr n3.4 = 3 Wire 4 Phase - Factory setting Up Arrow Up Arrow n3.4 Or 3.3 Via the up arrow. Press return twice. In.Pr In.Pr Set Voltage Ratio...