Page 4
Automatic integrated hydraulic lifting column Urban Top view pipeline Five-core lifting column power 220 V pump Well drain pipe cable with a 1.5 mm sectional area power cable directed toward the sewer Groove 1130 mm deep, Sinking pump with level with the ground a floating ball Bed course 200 mm thick Side view...
Page 6
Rise External Internal Stop Fall Public terminal ①...